বিজনেস বে-তে ক্লিনিক গ্রুপের প্রশাসনিক অফিস ফিট-আউট
বিজনেস বে-তে ক্লিনিকের অ্যাডমিন অফিস ফিট-আউট: একাধিক শাখার একটি ক্লিনিক গ্রুপের জন্য 260 m² ব্যাক-অফিস, যেখানে আছে ম্যানেজমেন্ট অফিস, ওপেন-প্ল্যান ডেস্কিং, একটি বোর্ডরুম এবং ফায়ার-রেটেড, প্রবেশ-নিয়ন্ত্রিত রেকর্ডস রুম; ছয় সপ্তাহে হস্তান্তর।
সংক্ষিপ্ত উত্তর
FIXORA Decor delivered partitioned management offices, open-plan desking, a boardroom and a secure, fire-rated records room with access control, all separate from any patient-facing clinical space. This case study explains what was built, why the records room needed special treatment, and how healthcare groups can plan a similar back-office move.
মূল তথ্য
- This clinic admin office fit-out in Business Bay gave a multi-branch dental and medical clinic group a dedicated 260 m² administrative headquarters in six weeks.
সর্বশেষ আপডেট:
This clinic admin office fit-out in Business Bay gave a multi-branch dental and medical clinic group a dedicated 260 m² administrative headquarters in six weeks. FIXORA Decor delivered partitioned management offices, open-plan desking, a boardroom and a secure, fire-rated records room with access control, all separate from any patient-facing clinical space. This case study explains what was built, why the records room needed special treatment, and how healthcare groups can plan a similar back-office move.
Project at a glance
| Item | Detail |
|---|---|
| Location | Business Bay, Dubai |
| Client | Clinic group (administrative office) |
| Area | 260 m² |
| Duration | 6 weeks |
| Use | Management, billing, scheduling and HR teams; no clinical areas |
| Key spaces | Management offices, open-plan desking, boardroom, secure records room, reception |
The brief
A clinic group with several branches across Dubai asked FIXORA Decor to fit out a dedicated administrative office in Business Bay to house management, billing, scheduling and HR teams, separate from any patient-facing clinical space. The brief included a secure records room and a boardroom for management meetings.
Scope of work
- Building management permit and fit-out drawing approval
- Partitioned management offices, open-plan desking for administrative teams and a boardroom
- Secure records room with restricted access control and fire-rated partitioning
- Suspended ceilings, lighting and a revised mechanical, electrical and plumbing layout
- Reception and waiting area joinery for visiting staff and suppliers
- Final Dubai Civil Defence fire system inspection and sign-off
The challenges
Although the office itself was not a clinical space, the records room needed fire-rated partitioning and access control to protect patient administrative data in line with the group's data protection obligations under UAE federal law. Tower management restricted noisy trades to agreed hours, and a brief DEWA disconnection was needed to complete the distribution board upgrade, scheduled outside the team's core working hours to avoid disrupting ongoing billing and scheduling operations during the six-week programme.
The result
The clinic group's administrative teams moved into a purpose-built back-office in six weeks, with a secure records room that meets their data-handling needs and a boardroom suitable for management meetings. The new office consolidated functions that had previously been split across smaller spaces at individual branches.
Why healthcare groups move admin out of the clinics
As clinic groups grow, billing, scheduling, insurance claims and HR often end up squeezed into spare rooms at each branch. That takes up space that could be used for patients and makes it harder to manage teams consistently. Moving these functions into a single commercial office brings several practical benefits:
- Clinical space is freed up at the branches for treatment and patient-facing use.
- Back-office teams work together, which simplifies supervision, training and process changes.
- The fit-out is simpler than clinical space. Because no patients are treated there, a standard commercial office approach applies rather than the requirements for clinical areas, though sensitive records still need careful handling.
- Management gets a proper meeting space away from the clinics for board meetings, supplier discussions and interviews.
If you are planning clinical space instead, our overview of DHA requirements for clinic interiors explains how that is different.
Designing a secure records room
The records room was the most specialised part of this project. In general terms, a room that holds sensitive administrative files in an office fit-out tends to combine three layers of protection:
- Fire-rated enclosure. Fire-rated partitions, a rated door set and sealed service penetrations help contain a fire and protect the contents for a period. Ratings must match the specification, and every cable or duct passing through the wall has to be firestopped, or the rating is compromised. Our guide to fire-rated doors and partitions in UAE buildings explains how these systems work.
- Restricted access. Access control on the door limits entry to authorised staff, and on most systems entries can be logged. The client's IT or compliance team usually decides who has access; the fit-out contractor provides the door hardware, cabling and power.
- Sensible internal layout. Shelving or cabinets sized for the records being stored, adequate lighting, and a location away from wet services such as pantries or washrooms.
Owners should brief their data protection or compliance adviser early so the room is designed to the organisation's own obligations, rather than retrofitted later.
How a Business Bay office fit-out is typically sequenced
Most Business Bay office towers are managed by a building management team that sets fit-out rules, and the design is usually reviewed before work starts. A typical sequence for an office of this size looks like this:
- Design and drawings. Layout, reflected ceiling plan, MEP and fire drawings are prepared and submitted for building management and authority review.
- Permits and site set-up. Once approved, contractor documents and insurance are lodged and the site is handed over.
- Partitions and first fix. Studs for offices, the boardroom and the records room go up; electrical, data and HVAC changes are run above the ceiling and inside walls.
- Ceilings, MEP and fire services. Suspended ceilings close up once services are in place, with lighting, diffusers, sprinklers and detectors repositioned to suit the new layout.
- Finishes and joinery. Flooring, painting, reception joinery and doors are installed.
- Testing and inspection. Fire systems are tested and inspected by Dubai Civil Defence before occupation; see Civil Defence approval for office fit-outs for the general process.
Keeping operations running
For any business with live operations such as billing and scheduling, disruption is the main risk. On projects like this we typically schedule power shutdowns outside core working hours, group noisy trades into the building's permitted windows and agree a clear move-in date so IT can be set up before staff arrive. The full journey is covered in our guide to the office fit-out process in Dubai.
Planning offices, desking and the boardroom
Back-office teams in healthcare have different needs from a typical sales office. Billing and insurance staff spend long hours on screens and phones, scheduling teams may take calls throughout the day, and HR needs a private room for confidential conversations. Owners planning similar space should consider:
- Acoustic separation between call-heavy teams and quieter work, using full-height partitions or acoustic treatment where needed; see our acoustic design guide for open-plan offices.
- Glare control on workstations near tower glazing, since low morning and evening sun in Dubai can make screens hard to read.
- Boardroom services such as floor boxes, a screen wall with concealed cabling and dimmable lighting.
- Reception joinery that suits visiting staff and suppliers rather than patients, with secure storage behind the counter.
Indicative cost factors
The ranges below are typical, indicative 2026 figures that depend on scope and specification. They are confirmed only after a site survey and exclude VAT at 5%.
| Fit-out level | Indicative range (AED per sq ft) | Typical content |
|---|---|---|
| Light refresh of a fitted office | 150–350 | Paint, carpet, minor partitions |
| Standard Cat B fit-out on a Cat A base | 250–450 | Partitions, ceilings, MEP changes, finishes |
| High-end office | 450 and above | Feature joinery, glass, acoustic treatment |
Items such as fire-rated partitions, access control, structured cabling and furniture can add significantly to a basic fit-out budget. For a detailed planner, see office fit-out cost per sq ft in Dubai.
Lessons for clinic groups planning a back-office
- Separate clinical from administrative space clearly in the brief, so the right standard is applied to each.
- Involve compliance early on any room that stores patient-related records.
- Plan the boardroom for real use: power and data at the table, screen location, lighting and acoustic privacy.
- Map the teams before drawing the layout. Billing, scheduling and HR often need different levels of privacy.
- Agree shutdown windows with building management well ahead of the electrical upgrade.
- Leave time for the fire inspection before the planned move-in date.
Planning checklist
- List every team moving in, with headcount and privacy needs.
- Define which rooms need fire rating, access control or acoustic privacy.
- Check the tower's fit-out guide and submission requirements.
- Confirm power and data needs for desks, boardroom and reception.
- Agree out-of-hours windows for shutdowns and noisy work.
- Book the Civil Defence inspection and IT set-up before move-in.
Key takeaways
- A 260 m² administrative headquarters for a multi-branch clinic group was delivered in Business Bay in six weeks.
- The records room combined fire-rated partitioning with restricted access control to protect patient administrative data.
- Shutdowns and noisy trades were scheduled to avoid disrupting billing and scheduling operations.
- Consolidating admin teams freed space at the branches and brought previously split functions together.
For end-to-end delivery from design to handover, see our turnkey fit-out service, or read about a larger Business Bay office in our trading company headquarters fit-out.
Frequently asked questions
Does a clinic's administrative office need DHA approval?
An office with no patient treatment is generally fitted out as a commercial office rather than as clinical space. Confirm with your compliance adviser and the relevant authority if any clinical activity will take place there.
What makes a records room secure?
Typically a fire-rated enclosure with a rated door and sealed penetrations, plus access control limiting entry to authorised staff. The exact standard should follow the organisation's own data protection obligations.
How long does a 260 m² office fit-out take in Business Bay?
This project took six weeks. Timelines depend on approvals, the scope of MEP changes, building working hours and how quickly finishes and furniture are confirmed.
Can an office fit-out be done without disrupting ongoing operations?
Yes, with planning. Power shutdowns can be scheduled outside core hours and noisy work grouped into permitted windows, as was done on this project.
Is a Civil Defence inspection required for an office fit-out?
Fit-outs that change fire systems or layouts normally need Dubai Civil Defence inspection and sign-off before occupation. Check current requirements with the authority and your building management.
Plan your healthcare back-office with FIXORA Decor
If your clinic group is consolidating administration into a dedicated office, FIXORA Decor can help with layout, secure rooms and approvals. WhatsApp +971501962136, call +971 50 196 2136, or request a quote to arrange a site visit.
গ্যালারি
সাধারণ জিজ্ঞাসা
An office with no patient treatment is generally fitted out as a commercial office rather than as clinical space. Confirm with your compliance adviser and the relevant authority if any clinical activity will take place there.
Typically a fire-rated enclosure with a rated door and sealed penetrations, plus access control limiting entry to authorised staff. The exact standard should follow the organisation's own data protection obligations.
This project took six weeks. Timelines depend on approvals, the scope of MEP changes, building working hours and how quickly finishes and furniture are confirmed.
Yes, with planning. Power shutdowns can be scheduled outside core hours and noisy work grouped into permitted windows, as was done on this project.
Fit-outs that change fire systems or layouts normally need Dubai Civil Defence inspection and sign-off before occupation. Check current requirements with the authority and your building management.