পাম জুমেইরা পেন্টহাউসের সম্পূর্ণ ফিট-আউট
পাম জুমেইরায় 420 m² আয়তনের চার-বেডরুমের একটি পেন্টহাউসের সম্পূর্ণ ইন্টেরিয়র ফিট-আউট; নতুনভাবে বিন্যস্ত লেআউট, শো কিচেন ও ডার্টি কিচেন, পাথরের বাথরুম, বেসপোক জয়েনারি ও টেরেস আপগ্রেডসহ FIXORA Decor ষোলো সপ্তাহে কাজটি সম্পন্ন করেছে।
সংক্ষিপ্ত উত্তর
FIXORA Decor reconfigured the living spaces, built a show kitchen with a separate dirty kitchen, refitted five bathrooms in porcelain slab and natural stone, and upgraded the terrace. This illustrative case study shows how a high-end apartment fit-out is planned and delivered inside a busy, occupied tower.
মূল তথ্য
- 420 m² চার-বেডরুমের পেন্টহাউসের সম্পূর্ণ ফিট-আউট
সর্বশেষ আপডেট:
This penthouse fit-out in Dubai transformed a 420 m² four-bedroom penthouse on Palm Jumeirah from a dated developer finish into a calm, sea-facing home in sixteen weeks of site work. FIXORA Decor reconfigured the living spaces, built a show kitchen with a separate dirty kitchen, refitted five bathrooms in porcelain slab and natural stone, and upgraded the terrace. This illustrative case study shows how a high-end apartment fit-out is planned and delivered inside a busy, occupied tower.
Penthouse fit-out in Dubai: the brief
The owner bought the penthouse for its views across the Arabian Gulf and back to the Dubai Marina skyline, but the interior worked against those views. Heavy partition walls cut the living area into three rooms, the kitchen was closed and dark, the bathrooms had glossy beige tiles and the joinery was worn. The family planned to live in the unit full time and to host large gatherings, especially during the cooler months.
The brief set out clear priorities:
- Open the main living, dining and kitchen into one space that faces the sea
- A show kitchen with an island for entertaining, plus a dirty kitchen for heavy cooking and catered events
- A principal suite with a dressing room and a bathroom that feels like a hotel spa
- Durable, quiet, low-maintenance finishes that would cope with salt air and strong sun
- Integrated lighting, curtains and AC control, without a wall of switches
- Completion within one summer while the family was abroad
Challenges
Working in an occupied tower
The building had strict fit-out rules: working hours, noise windows, a booked service lift, floor and lift protection, and no material storage in corridors. Every delivery, from stone slabs to the kitchen island, had to fit the service lift or be lifted by agreement with building management. Slab sizes were chosen with the lift dimensions in mind before anything was ordered.
Which walls can move
Not every wall in a tower can be removed. Some carry services, some are fire-rated, and some form part of the structure. Before design was fixed, the existing drawings were checked against the building's documents and the walls proposed for removal were reviewed by the consultant. Two walls were confirmed as non-structural partitions; one was a shear wall and stayed, becoming a feature clad in fluted timber.
Drainage for the new kitchen layout
Moving a kitchen in a tower is limited by drainage. The island sink needed a fall to the existing stack, which meant raising part of the floor slightly and designing the island sink position around where pipework could run, rather than the other way round.
Sun, glare and salt
Full-height glazing on three sides means intense sun and glare for much of the year. Salt air corrodes cheap metal fittings on terraces and near windows. Specifications had to deal with both.
Approvals obtained
Apartment fit-outs in master communities need the owners' association or building management approval and, for anything beyond cosmetic work, a fit-out permit through the master developer and the relevant authority. In general terms, the route for this penthouse was:
- Building management fit-out application: scope description, contractor licences, insurance and method statement, with a refundable security deposit
- Master developer and authority approval: drawings for partition changes, MEP modifications and fire safety items, submitted by a licensed consultant
- Fire and life safety: relocation of sprinkler heads and smoke detectors to suit the new ceilings, approved and inspected
- Final inspection: building management and authority sign-off and release of the deposit
Fit-out rules and fees differ between towers and change over time, so owners should always ask building management for the current handbook before they get quotes.
Design approach
The design was built around the view, the light and the way the family entertains.
- One long sea-facing room: removing two partitions created a 17 m living, dining and kitchen space, with zones defined by ceiling changes, rugs and lighting rather than walls
- Quiet materials: pale oak, warm white plaster, honed limestone-look porcelain and brushed bronze details, so nothing competes with the sea
- Kitchen as furniture: handleless tall units on one wall and a 3.6 m island in sintered stone; appliances hidden behind pocket doors
- Dirty kitchen behind the scenes: a fully tiled working kitchen with a heavy-duty hood, gas-free induction hobs and space for catering, connected to the maid's room and service entrance
- Spa bathroom: a walk-in shower with bench, freestanding bath facing the window and book-matched porcelain slabs on the walls
- Hidden technology: motorised sheers and blackout curtains, scene-based lighting and AC zones controlled from a few keypads and a phone app
Scope of work
- Protection of lifts, corridors and the unit's windows and existing finishes to be kept
- Demolition of two partitions, kitchen, bathrooms, flooring and old joinery
- New partitions with acoustic insulation between bedrooms
- Electrical rewiring of lighting circuits, new distribution board, data and smart-control wiring
- AC duct modifications, new linear diffusers and zone control
- Sprinkler and smoke detector relocation to suit new ceilings
- Plumbing and drainage for the island, dirty kitchen and five bathrooms
- Waterproofing and floor levelling in wet areas
- Gypsum ceilings with curtain pockets, cove lighting and access panels
- Large-format porcelain flooring to living areas and engineered oak to bedrooms
- Show kitchen, dirty kitchen, wardrobes, dressing room and media wall joinery
- Five bathrooms with porcelain slab walls, stone vanities and concealed cisterns
- Motorised curtains and blinds
- Terrace: new outdoor porcelain on pedestals, planters, outdoor lighting and marine-grade fixings
- Final cleaning, testing and commissioning
Materials and finishes
| Location | Material | Notes |
|---|---|---|
| Living and kitchen floor | 120 × 120 cm honed porcelain, limestone look | Sized to fit the service lift and reduce joints |
| Bedrooms | Engineered oak, matt lacquer | Stable with AC and humidity changes |
| Kitchen island | Sintered stone, 12 mm with mitred edges | Heat, stain and scratch resistant |
| Dirty kitchen | Full-height porcelain wall tile, stainless steel worktop | Built for heavy cooking and easy cleaning |
| Bathroom walls | Book-matched porcelain slabs | Marble look without staining or sealing |
| Vanities | Natural stone tops on oak veneer cabinets | Warmth with durability |
| Feature wall | Fluted oak veneer panels | Disguises the retained shear wall |
| Terrace | 20 mm outdoor porcelain on adjustable pedestals, 316 stainless fixings | Resists salt air and allows drainage below |
| Window treatments | Motorised sheer and blackout curtains with UV-stable fabric | Controls glare and protects floors and furniture |
Programme and phasing
| Weeks | Phase | Work |
|---|---|---|
| Pre-start | Design and approvals | Design, samples, fit-out approval, shop drawings, joinery and stone orders |
| 1–2 | Strip-out | Protection, demolition, debris removal within building hours |
| 3–6 | First fix | Partitions, MEP, drainage, AC ducts, sprinkler relocation |
| 7–9 | Closing up | Ceilings, waterproofing, screeds, inspection by building management |
| 10–13 | Finishes | Flooring, wall slabs, painting, terrace |
| 14–15 | Joinery and fixtures | Kitchens, wardrobes, vanities, sanitaryware, curtains |
| 16 | Commissioning | Smart controls, AC balancing, snagging, deep cleaning, final inspection |
Joinery was manufactured in our partner workshop in parallel with site work, so it arrived ready to install once floors and walls were complete. This saved four to five weeks compared with measuring and making after the finishes.
Quality and safety
- Daily permit-to-work for hot works, with fire watch and extinguishers on the floor
- Dust extraction on cutting tools and sealed doors to protect the building's corridors
- Noise-heavy work kept to the building's approved hours
- Waterproofing flood tests in every bathroom and the dirty kitchen
- Slab and stone inspection on delivery before installation
- Pressure tests on water pipework and checks on drainage falls before closing floors
- A weekly report with photos to the owner, who was abroad for most of the project
Handover and aftercare
The family returned to a finished, cleaned home with the smart system already programmed with their preferred scenes. Handover included a walk-round, a training session on lighting and curtain controls, a manual with all product data and warranties, and the building's final approval letter.
FIXORA Decor provides a twelve-month defects period on workmanship. During that time a cabinet door hinge was adjusted and a curtain motor was reset after a power cut. Terrace fixings and outdoor lights were checked after the first sandstorm season. The owner chose an annual maintenance plan covering AC, plumbing and smart-control checks.
Results
- An open, sea-facing living space that the family describes as the reason they bought the penthouse
- A show kitchen for guests and a working kitchen that keeps cooking smells and noise out of sight
- Bathrooms with a luxury marble look and none of the maintenance of real marble on walls
- Lower glare and better comfort thanks to motorised curtains and AC zoning
- Fit-out approved and deposit released without disputes
High-end penthouse fit-outs in Dubai usually fall in an indicative 2026 range of around AED 2,500 to AED 6,000 per square metre depending on layout changes, joinery, stone and smart-home scope, excluding furniture and 5% VAT. Every penthouse is different, so a survey and design brief come before any firm price.
Lessons for other owners
- Read the building handbook first. Working hours, lift size and deposit rules shape the programme and the materials.
- Check walls before designing around their removal. A retained wall can become a feature if you know early.
- Let drainage lead the kitchen design. Islands with sinks need a route to the stack.
- Make joinery off site. Parallel manufacture is the biggest time saver on a fit-out.
- Plan for sun and salt. UV-stable fabrics and marine-grade fixings repay themselves quickly on the Palm.
- Keep technology simple. A few clear scenes beat a complicated system nobody uses.
Key takeaways
- A full penthouse fit-out typically needs around four months on site plus design and approvals.
- Building management and authority approvals are part of every serious apartment fit-out.
- A dirty kitchen behind a show kitchen suits how many UAE families cook and entertain.
- Large-format porcelain gives a stone look with far less maintenance.
Planning a penthouse or apartment fit-out?
FIXORA Decor delivers apartment and penthouse fit-outs across Palm Jumeirah, Dubai Marina, Downtown and Business Bay, from approvals to aftercare. Share your floor plan on WhatsApp at +971501962136, call +971 50 196 2136 or request a quote.