समर ऑफ़र: एसी डीप क्लीनिंग पर 20% छूट — 30 जून से पहले बुक करेंअभी बुक करें
सामग्री पर जाएं

डाउनटाउन दुबई में होटल गेस्ट रूम रिफर्बिशमेंट: 64 कमरे फ़्लोर-दर-फ़्लोर

डाउनटाउन दुबई में एक उदाहरणात्मक होटल रूम रिफर्बिशमेंट: होटल के चालू रहते हुए 64 गेस्ट रूम और कॉरिडोर फ़्लोर-दर-फ़्लोर नवीनीकृत, जिसमें अकूस्टिक नियंत्रण, मॉक-अप रूम, नए बाथरूम और प्रति फ़्लोर 13-दिन का टर्नअराउंड शामिल है।

त्वरित उत्तर

FIXORA Decor worked one floor at a time, turning each floor around in about 13 working days, with new carpets, wall coverings, joinery, lighting, bathrooms and in-room controls. This is an illustrative example of how we approach occupied hotel refurbishments; the hotel is not named.

मुख्य तथ्य

  • FIXORA Decor worked one floor at a time, turning each floor around in about 13 working days, with new carpets, wall coverings, joinery, lighting, bathrooms and in-room controls.

अंतिम अपडेट:

This hotel room refurbishment in Downtown Dubai renewed 64 guest rooms and four corridors while the hotel kept trading. FIXORA Decor worked one floor at a time, turning each floor around in about 13 working days, with new carpets, wall coverings, joinery, lighting, bathrooms and in-room controls. Noise and dust were controlled so guests on the floors above and below were not disturbed. This is an illustrative example of how we approach occupied hotel refurbishments; the hotel is not named.

The brief: hotel room refurbishment without closing the hotel

The hotel is a mid-size city property near the Downtown boulevard, popular with business travellers and families visiting for events and shopping. Its rooms were about ten years old: the layout was still good, but carpets were stained, bathroom grout was dark, wardrobe doors sagged, and guests complained about bedside lighting and too few charging points. The owner wanted a refreshed look that matched a planned brand standard update, a modern bathroom with a walk-in shower in place of the bath in standard rooms, and better acoustic comfort between rooms.

Closing the hotel was not an option. The owner set a clear rule: no more than one floor out of service at a time, no noisy works during the quiet hours agreed with the hotel, and no visible construction in guest areas. The work had to be finished before the start of the next peak event season.

Challenges

  • Noise. Breaking out bathroom tiles and baths is loud, and sound travels through structure into rooms above and below.
  • Dust and smell. Hotel corridors share air systems, and fresh paint or adhesive smells can reach occupied floors.
  • Logistics. All materials and debris had to move through one service lift shared with housekeeping and room service.
  • Hidden conditions. Ten-year-old bathrooms can hide leaks, damaged waterproofing and corroded pipework behind the tiles.
  • Consistency. 64 rooms must look identical, so tolerances, colours and installation details had to be fixed before rollout.

Approvals (in general terms)

Hotel refurbishments in Dubai usually need building management and owner approval, a fit-out or modification permit from the relevant authority, and Dubai Civil Defence review of anything that affects fire safety: corridor finishes, doors, smoke detectors, sprinklers and signage. Hotel classification and tourism standards also matter, so the hotel's operations team checked that the new room design kept the facilities required for its category. Replacing baths with showers changed drainage details, which were included in the submission. We prepared the drawings, material fire ratings and method statements, while the hotel's engineering team coordinated isolation of fire alarm zones floor by floor. Current fees and approval times should always be checked with each authority.

Design approach

We started with a mock-up room. One standard room and one bathroom were completed in full and left for the owner, brand team and operations staff to test for two weeks. That room changed several details: the headboard reading lights were moved lower, a second USB-C point was added on the desk side, the shower glass was extended to stop splashing, and the wardrobe was opened up so that luggage could be stored at floor level.

The final design uses a warm grey and sand palette with timber-look joinery, a fabric-wrapped headboard wall with acoustic backing, and woven vinyl wall covering that is durable and easy to wipe. Bedside switches control the room lights, curtains and a do-not-disturb indicator. In bathrooms, large-format porcelain replaces small tiles to reduce grout lines, the walk-in shower has a linear drain and a thermostatic mixer, and a wall-hung WC makes floor cleaning faster for housekeeping.

To reduce noise between rooms, we added mineral wool and an extra layer of acoustic plasterboard behind the headboard wall, sealed gaps around pipes and cables, and fitted new door seals and drop seals to room entry doors.

Scope of work per floor

  • Removal of carpets, wall coverings, joinery, bathroom tiles, baths and sanitaryware
  • Inspection and repair of bathroom pipework and drainage; new waterproofing membrane with flood test
  • Walk-in showers with linear drains, glass screens and thermostatic mixers
  • Wall-hung WCs with concealed cisterns, new vanities and mirrors with integrated lighting
  • Acoustic upgrade of headboard walls and door seals
  • New carpet with acoustic underlay, woven vinyl wall covering and paint
  • Wardrobe, desk, luggage bench and minibar joinery
  • LED lighting, bedside controls, USB-C and universal sockets
  • Corridor carpet, wall finish, lighting and room signage

Materials

ItemMaterialBenefit
Guest room floorSolution-dyed carpet tiles with acoustic underlayStain-resistant, single tiles can be replaced
WallsWoven vinyl wall covering, fire-ratedDurable, wipeable, meets corridor fire requirements
Bathroom walls and floorLarge-format porcelain over cement-based waterproofingFewer grout lines, faster cleaning
ShowerLinear stainless drain, 10 mm toughened glassLevel access, less splashing
JoineryMoisture-resistant board with high-pressure laminateResists scratches from luggage
Headboard wallFabric panels over acoustic board and mineral woolQuieter rooms, softer look
LightingWarm white LED, dimmableLower energy and maintenance

Programme: one floor at a time

After the mock-up, the eight floors (eight rooms each) were done in sequence. Each floor followed the same 13-working-day cycle so that trades moved like a production line:

  1. Days 1–2: hoarding at the lift lobby, isolation of fire zones by hotel engineering, strip-out with debris removed in bagged loads via the service lift at agreed times.
  2. Days 3–5: plumbing repairs, waterproofing and flood tests, acoustic wall works.
  3. Days 6–8: tiling, sanitaryware, glass, electrical second fix.
  4. Days 9–11: joinery, wall coverings, carpet and lighting.
  5. Days 12–13: snagging by our team, then joint inspection with the hotel's engineering and housekeeping managers before rooms returned to inventory.

Breaking-out of tiles was limited to agreed daytime windows when most guests were out, and stopped completely during quiet hours. Negative pressure fans with filters kept dust inside the work floor, and low-odour paints and adhesives were used throughout. The hotel informed guests on adjacent floors in advance, and front office avoided allocating rooms directly above and below the work zone during breaking-out days.

Handover

Each floor was handed over with a room-by-room checklist signed by the hotel. At the end of the project the owner received as-built drawings, waterproofing flood test records, electrical test certificates, product data sheets and warranties, an attic stock of carpet tiles, wall covering and porcelain, and a housekeeping guide on cleaning the new finishes. A 12-month defects period applies, and our team carried out a check of all rooms three months after the last floor was completed.

Working with hotel operations

An occupied hotel is a 24-hour business, and the refurbishment had to fit into its routines rather than the other way round. Before work started we held a coordination meeting with the general manager, front office, housekeeping, security and engineering. Together we agreed the room blocking plan, the service lift timetable, the hours when breaking-out was allowed, the route for debris from the service lift to the loading bay, and how complaints would be handled if a guest was disturbed. A named site supervisor carried a hotel radio so front office could reach him immediately, and our team followed the hotel's dress code and conduct rules in back-of-house areas.

Every morning the supervisor met the hotel's engineering manager for ten minutes to confirm the day's activities, fire zone isolations and any deliveries. Every Thursday a short progress report with photographs went to the owner and operator, listing rooms completed, rooms in progress, hidden issues found and any decisions needed. When a VIP group booked several floors during an event week, the programme was paused for three days and the team moved to off-site joinery preparation, which kept the overall schedule on track. Working this way built trust quickly: by the third floor, the hotel was releasing rooms to us a day early because it was confident they would come back on time and in perfect condition.

Results

  • All 64 rooms and four corridors refurbished with the hotel open throughout.
  • Only one floor out of inventory at any time, as agreed with the owner.
  • Hidden leaks were found and fixed in several bathrooms during strip-out, preventing future ceiling damage below.
  • Housekeeping reports faster bathroom cleaning thanks to fewer grout lines and wall-hung WCs.
  • The operator reports fewer guest comments about noise and lighting since the refurbishment.

Lessons learned

The mock-up room paid for itself many times over. Every change made there was made once, not 64 times. Second, the service lift is the real bottleneck in an occupied hotel refurbishment, so we agreed a lift schedule with housekeeping at the start and stuck to it. Third, allow time and budget for hidden bathroom problems: in this project several rooms needed pipe repairs, and having a fixed rate agreed in advance avoided delays while waiting for approvals.

Key takeaways

  • Build and test a full mock-up room before rolling out a design.
  • Refurbish floor by floor on a repeatable cycle to keep the hotel trading.
  • Control noise, dust and smell with timing, filters and low-odour products.
  • Agree service lift times and hidden-works rates before starting.

Planning a hotel or hotel apartment refurbishment?

Indicative 2026 budgets for a guest room refurbishment of this scope typically range from around AED 45,000 to AED 95,000 per room plus 5% VAT, depending on bathroom works, joinery and finishes; we confirm costs after surveying sample rooms. Contact FIXORA Decor on WhatsApp +971501962136, email fixora994@gmail.com or request a quote at /quote.

गैलरी

स्रोत

अपना प्रोजेक्ट शुरू करें

हमारी टीम मदद के लिए तैयार है — आज ही मुफ़्त कोटेशन पाएं।

या हमें कॉल करें+971 50 196 2136

सेवा क्षेत्र