بزنس بے میں فل سروس ریسٹورنٹ فٹ آؤٹ
بزنس بے میں ریسٹورنٹ فٹ آؤٹ: ایک ٹاور میں 320 m² کا فل سروس ریسٹورنٹ 14 ہفتوں میں مکمل، اوپن شو کچن، ڈائننگ روم اور ٹیرس کے ساتھ، اور دبئی میونسپلٹی اور سول ڈیفنس کی منظوریاں ڈیزائن کے مرحلے سے ہی سنبھالی گئیں۔
فوری جواب
FIXORA Decor completed the work in 14 weeks, managing Dubai Municipality food premises and Dubai Civil Defence approvals from design stage, and the restaurant opened with sign-off on the full kitchen and dining fit-out. Business Bay combines offices, hotels and residential towers along the Dubai Water Canal, which gives ground-floor restaurants a mix of lunchtime business trade and evening diners.
اہم حقائق
- A 320 m² double-height restaurant with a terrace in Business Bay was fitted out in 14 weeks.
آخری اپ ڈیٹ:
This restaurant fit-out in Business Bay delivered a 320 m² full-service restaurant in a double-height ground-floor tower unit, with an open show kitchen, a dining room and a terrace. FIXORA Decor completed the work in 14 weeks, managing Dubai Municipality food premises and Dubai Civil Defence approvals from design stage, and the restaurant opened with sign-off on the full kitchen and dining fit-out.
Below we explain the brief, the scope and how the show kitchen was made both compliant and attractive, then share practical guidance for operators planning a restaurant in a Dubai tower.
Project at a glance
| Item | Detail |
|---|---|
| Location | Business Bay, Dubai |
| Client | Restaurant operator |
| Sector | Hospitality |
| Area | 320 m² |
| Duration | 14 weeks |
| Completed | November 2023 |
| Approvals | Dubai Municipality and Dubai Civil Defence sign-off |
The brief
A restaurant operator took a double-height ground-floor unit with a terrace in Business Bay and asked FIXORA Decor to deliver a full-service fit-out, including an open show kitchen visible from the dining room.
Business Bay combines offices, hotels and residential towers along the Dubai Water Canal, which gives ground-floor restaurants a mix of lunchtime business trade and evening diners. A double-height unit with a terrace is an attractive opportunity, but it also means larger volumes to cool, more complex ceilings and outdoor works that have to cope with the climate.
Scope of work
- Commercial kitchen design to Dubai Municipality food premises requirements, with separate preparation, cooking and wash-up zones
- Extraction hood, ducting and grease trap sized for the full equipment load, coordinated with the tower's base-build risers
- Dining room joinery, flooring, feature lighting and acoustic ceiling treatment
- Terrace decking, shade structure and outdoor furniture fixings suited to the local climate
- Dubai Civil Defence approval for kitchen fire suppression, gas detection and dining room exit routes
The project drew on our turnkey fit-out, interior design and joinery teams.
Challenges and how they were solved
A show kitchen that is compliant and looks right
An open show kitchen format meant the extraction and fire suppression design had to satisfy Dubai Civil Defence while still looking the part for diners, so FIXORA Decor worked closely with the kitchen equipment supplier and the base-build consultant to integrate a compliant canopy without an industrial appearance.
In a closed kitchen, hoods, ducts and suppression pipework can be purely functional. In a show kitchen, they are part of the interior design. The canopy, its finishes and the way ducting leaves the space all have to be designed together, and every choice must still meet the fire and extraction requirements.
Terrace works in the summer
Terrace works were timed to avoid the midday outdoor work restriction during the summer months, so the outdoor programme was planned around shorter working windows in the hottest part of the day.
Result
The restaurant opened with Dubai Municipality and Civil Defence sign-off on the full kitchen and dining fit-out, and a terrace that extended the dining offer into the evening. The open kitchen became a visible selling point for the brand.
What a restaurant fit-out in a Dubai tower involves
Restaurants are among the most technically demanding commercial fit-outs. On top of interior design, they involve commercial kitchen design, extraction, drainage, gas, fire suppression and food safety requirements, all coordinated with a building that was designed by someone else. Our guide to restaurant fit-out requirements and process in Dubai covers the full journey.
Approvals in general terms
- Landlord and building management: fit-out approval, base-build coordination, working hours and access.
- Dubai Municipality: food premises requirements for the kitchen layout, finishes and hygiene provisions, plus building permits where needed.
- Dubai Civil Defence: fire suppression, gas detection, alarms, emergency lighting and exit routes.
- DEWA: where additional electrical load is needed.
- Master developer or free-zone authority: depending on the location, for signage, terraces and external works.
Requirements and fees change, so check the current position with each body. For the fire side, see our step-by-step guide to Civil Defence approval for restaurant fit-outs.
How projects like this are usually sequenced
- Concept and menu review: the menu drives equipment, which drives extraction, power, gas and drainage.
- Kitchen design: zoning for preparation, cooking and wash-up, with clear flows for food and waste.
- Base-build coordination: confirm risers, exhaust routes, grease trap location and spare capacity with the building.
- Authority drawings and approvals: municipality food premises and Civil Defence submissions.
- First fix: drainage, gas, electrical, ductwork and fire services.
- Kitchen installation: hoods, suppression, equipment and stainless steel fixtures.
- Front of house: ceilings, flooring, joinery, lighting and acoustic treatment.
- Terrace: decking, shade and fixings, timed around the summer outdoor work break.
- Testing and inspections: systems testing, authority inspections and snagging before opening.
Kitchen extraction and drainage in Dubai towers
Extraction and grease management are where many restaurant projects run into trouble. A few principles help:
- Size for the full equipment load. As on this project, extraction hoods, ducting and grease traps should be sized for everything that will cook, not just the opening menu.
- Confirm the route early. In a tower, exhaust usually has to connect to base-build risers or approved routes; the landlord's consultant needs to agree it.
- Plan the grease trap for access. It will need regular cleaning, so it should be reachable without disrupting service.
- Coordinate suppression with the hood. Fire suppression and gas detection are part of the kitchen design, not an add-on.
Our article on restaurant kitchen design and exhaust rules in Dubai covers this in more depth.
Designing the dining room and terrace for the climate
| Element | Good practice | Why it matters in Dubai |
|---|---|---|
| Double-height dining room | Acoustic ceiling treatment and zoned lighting | Hard surfaces and height make busy rooms loud |
| Dining flooring | Hard-wearing, slip-resistant near service routes | Heavy daily traffic and frequent cleaning |
| Joinery | Durable finishes, robust edges | Constant use by guests and staff |
| Terrace decking | Weather-resistant, UV-stable materials | Strong sun, heat, dust and humidity |
| Shade structure | Secure fixings, wind-rated design | Makes outdoor seating usable for more of the year |
| Outdoor furniture fixings | Corrosion-resistant and suited to the climate | Humidity and occasional strong winds |
Cost factors
As a typical / indicative 2026 range from our published guides, full-service casual dining restaurants in Dubai commonly cost around AED 450–800 per sq ft to fit out, excluding 5% VAT and usually kitchen equipment. These ranges depend on scope, are confirmed after a site survey and are not the cost of this project. Main drivers include:
- Kitchen size, menu and equipment load
- Extraction, suppression and gas works, especially in towers
- Base-build condition and how much MEP can be reused
- Ceiling height and the complexity of feature lighting and joinery
- Terrace scope, shade and outdoor finishes
- Authority and landlord requirements
See restaurant fit-out cost in Dubai for a fuller breakdown.
Lessons for restaurant operators
- Fix the menu before the kitchen design. Late changes to cooking equipment ripple through extraction, gas and fire design.
- Involve the equipment supplier and base-build consultant early. On this project, that collaboration produced a compliant canopy without an industrial look.
- Treat approvals as part of design. Managing municipality and Civil Defence requirements from the start reduces late redesign.
- Plan terraces around the seasons. Outdoor works and the summer midday break need to be in the programme from day one.
- Design acoustics deliberately. Double-height rooms need acoustic treatment to stay comfortable when full.
Restaurant fit-out checklist
- Confirm the unit's extraction route, gas availability, grease trap position and power.
- Finalise the menu and equipment list.
- Design kitchen zones for preparation, cooking and wash-up.
- Prepare municipality and Civil Defence submissions with the design.
- Agree base-build coordination with the landlord's consultant.
- Plan the terrace, shade and fixings for the climate.
- Schedule outdoor work around summer restrictions.
- Allow time for testing, inspections and staff training before opening.
For related hospitality work, see our beachfront restaurant refurbishment on Palm Jumeirah and an independent café fit-out in JLT.
Key takeaways
- A 320 m² double-height restaurant with a terrace in Business Bay was fitted out in 14 weeks.
- The kitchen was designed to Dubai Municipality food premises requirements with separate preparation, cooking and wash-up zones.
- Extraction, ducting and the grease trap were sized for the full equipment load and coordinated with base-build risers.
- The show kitchen canopy met Civil Defence requirements without an industrial appearance.
- The restaurant opened with Dubai Municipality and Civil Defence sign-off, and the open kitchen became a selling point.
Frequently asked questions
How long does a restaurant fit-out take in Dubai?
This 320 m² full-service restaurant took 14 weeks. Design, landlord review and authority approvals add time, so plan the full journey from lease to opening.
Which approvals does a restaurant need in Dubai?
Typically landlord approval, Dubai Municipality food premises requirements and Dubai Civil Defence approval for fire suppression, gas detection and exits, plus DEWA where load increases. Requirements vary by location.
Can a restaurant have an open show kitchen in Dubai?
Yes, if extraction and fire suppression meet Civil Defence requirements. Here the canopy was designed with the equipment supplier and base-build consultant so it was compliant and attractive.
Why is the grease trap so important?
It stops fats and oils entering the building drainage. It should be sized for the full equipment load and placed where it can be cleaned regularly.
Can terrace works continue during the Dubai summer?
Yes, but outdoor work must respect the summer midday outdoor work restriction, so terrace programmes need to be planned around it.
Planning a restaurant fit-out?
FIXORA Decor delivers restaurant and café fit-outs across Dubai, from kitchen design to approvals and opening. Send us your unit details on WhatsApp at +971501962136, call +971 50 196 2136, or request a quote to arrange a site survey.
گیلری
اکثر پوچھے جانے والے سوالات
This 320 m² full-service restaurant took 14 weeks. Design, landlord review and authority approvals add time, so plan the full journey from lease to opening.
Typically landlord approval, Dubai Municipality food premises requirements and Dubai Civil Defence approval for fire suppression, gas detection and exits, plus DEWA where load increases. Requirements vary by location.
Yes, if extraction and fire suppression meet Civil Defence requirements. Here the canopy was designed with the equipment supplier and base-build consultant so it was compliant and attractive.
It stops fats and oils entering the building drainage. It should be sized for the full equipment load and placed where it can be cleaned regularly.
Yes, but outdoor work must respect the summer midday outdoor work restriction, so terrace programmes need to be planned around it.