商业湾公寓全面翻新

商业湾公寓翻新:一套 150 m² 三居室住宅七周内全面翻新,包括新厨房、三个重新装配的卫生间、实木复合与瓷砖地板、电气和重刷,全部在楼宇管理处批准的时间内完成。

快速解答

商业湾公寓翻新:一套 150 m² 三居室住宅七周内全面翻新,包括新厨房、三个重新装配的卫生间、实木复合与瓷砖地板、电气和重刷,全部在楼宇管理处批准的时间内完成。 This Business Bay apartment renovation turned a three-bedroom, 150 m² home that had seen more than a decade of use into a consistently finished apartment in seven weeks. The apartment was fully renovated in seven weeks, with the restricted working hours absorbed into the programme rather than causing delay.

关键信息

  • This Business Bay apartment renovation turned a three-bedroom, 150 m² home that had seen more than a decade of use into a consistently finished apartment in seven weeks.

最后更新:

This Business Bay apartment renovation turned a three-bedroom, 150 m² home that had seen more than a decade of use into a consistently finished apartment in seven weeks. FIXORA Decor replaced the kitchen, refitted all three bathrooms, laid new flooring, upgraded the electrics and repainted throughout, while working inside the tower's restricted hours for noisy trades. Below is what the job involved, how a tower renovation like this is usually planned, and what owners in a similar position should prepare for.

Project at a glance

ItemDetail
LocationBusiness Bay, Dubai
PropertyThree-bedroom apartment, owner-occupied
Area150 m²
Duration7 weeks
ClientPrivate apartment owner
Main worksKitchen, three bathrooms, flooring, lighting and electrics, full repaint

The brief

The owner-occupier asked FIXORA Decor for a full renovation after more than a decade of use, covering the kitchen, all bathrooms, flooring, lighting and a full repaint. The owner moved out for the duration of the works, which is the single decision that most simplifies a full apartment renovation: trades can work room to room without packing and unpacking each day, dust control is easier, and the programme does not have to protect a lived-in space.

Scope of work

  • Building management permit, insurance documentation and freight lift booking
  • Strip-out of the existing kitchen, bathrooms and flooring
  • New kitchen joinery, worktop and appliances allowance
  • Three bathrooms refitted with new waterproofing, tiling and sanitaryware
  • Engineered timber and porcelain flooring throughout, with new skirting
  • Electrical upgrade with a scheduled DEWA disconnection, and a full repaint

The challenges

Tower management restricted noisy work, such as tiling and chasing, to specific weekday hours, which meant the seven-week programme had to be built around a shorter effective working day than an unrestricted site. All deliveries and waste removal went through the building's freight lift on a booked schedule, and the brief DEWA disconnection for the electrical upgrade had to be coordinated with building management and the neighbouring units in advance.

The result

The apartment was fully renovated in seven weeks, with the restricted working hours absorbed into the programme rather than causing delay. The owner returned to a consistently finished home with a new kitchen, three refitted bathrooms and updated flooring and lighting throughout.

What a full apartment renovation in a Business Bay tower involves

Business Bay is almost entirely high-rise, so a renovation there is shaped as much by the building as by the apartment. Every tower has its own building management or owners' association rules covering permitted hours, noise, lift use, waste, insurance and who may work on site. Before any tools arrive, owners typically need to submit a renovation application with a scope description, contractor trade licence and insurance certificates, and sometimes drawings for any changes to layout, plumbing or electrics. Our guide to apartment renovation rules in Dubai towers explains what is usually allowed and what is not.

Inside the apartment, a full renovation of this kind is a sequence of dependent trades. The order matters because each stage hides the one before it:

  1. Protection and strip-out. Corridors, lift interiors and the apartment door are protected; old kitchen units, sanitaryware, tiles and flooring are removed and taken out through the freight lift in booked slots.
  2. First fix. New electrical routes, plumbing and drainage connections are run while walls and floors are open. This is where chasing happens, so it falls inside the noisy-work window.
  3. Waterproofing and screeds. Bathroom floors and shower areas are waterproofed and tested before any tile goes down.
  4. Tiling and flooring. Wet areas are tiled, then porcelain and engineered timber are laid in the living spaces, timber typically last so it is not damaged by other trades.
  5. Joinery and second fix. Kitchen units, worktop, sanitaryware, sockets, switches and light fittings go in.
  6. Painting, snagging and cleaning. A full repaint, a room-by-room snag list and a final clean before handover.

Why restricted hours change the programme

When a tower limits noisy trades to set weekday windows, the job cannot simply run at full speed every day. On projects like this we typically group the loud activities (breaking out tiles, chasing walls, cutting porcelain) into the permitted windows and use the quieter hours for work such as waterproofing, joinery assembly, electrical second fix and painting. Material cutting can sometimes be done off site or in a designated area if the building allows it. Planning this split in advance is what lets a programme absorb the restriction instead of being extended by it. Our guide to contractor working hours in Dubai towers and communities covers the typical rules.

Freight lift logistics

In a tower, every tile, cabinet carcass and bag of waste moves through the service lift. Booked slots mean deliveries have to be consolidated rather than drip-fed, large items such as worktops must be measured against lift dimensions, and debris is bagged and removed on a schedule rather than piling up in the apartment. Owners should ask a contractor how they plan lift bookings, because a missed slot can cost a day.

DEWA disconnection for electrical upgrades

Replacing or upgrading a distribution board, or reworking circuits in a full renovation, usually needs the power to the unit isolated. In a tower this is coordinated with building management and, where shared risers or supplies are involved, with neighbouring units. Any change to connected load may need a separate application to DEWA, so it is worth confirming early whether the planned upgrade stays within the existing allowance. See DEWA load increase and electrical approvals for how this works in general terms.

Material choices for Dubai apartments

The combination used here, engineered timber in living and bedroom areas with porcelain in wet and high-traffic zones, is a common choice for Dubai apartments, and the reasons are mostly climatic:

  • Engineered timber is more dimensionally stable than solid wood, which matters in a city where air conditioning runs most of the year and humidity can rise sharply if the AC is switched off while an apartment is empty.
  • Porcelain is dense, low-absorption and easy to clean, which suits kitchens, bathrooms, entrances and balconies where sand and dust are tracked in.
  • Bathroom waterproofing is the part owners never see but most need to get right. A tested membrane under the tiles protects the apartment below; our explainer on bathroom waterproofing materials compares the common systems.
  • Washable paint finishes in kitchens and corridors make day-to-day marks easier to wipe off, while a softer finish on bedroom walls is usually preferred.

For more on flooring options and how they are installed, see our flooring service.

Indicative cost factors

Every apartment is different, and the figures below are typical, indicative 2026 ranges that depend on scope and specification. They are confirmed only after a site survey and exclude 5% VAT unless stated otherwise.

ElementIndicative range (AED)What moves the price
Full apartment kitchen replacement25,000–60,000Cabinet material, worktop type, appliance allowance
Standard apartment bathroom refit (each)15,000–35,000Tile size and quality, sanitaryware, glass screens
Full three-bedroom renovation90,000–220,000Number of rooms touched, finish level, electrical scope

Other factors that commonly affect cost in a tower include the building's permit and refundable deposit requirements, limited working hours, lift booking constraints and the condition of existing pipework and electrics once walls are opened. For a detailed breakdown of kitchen budgets, read kitchen renovation cost in Dubai.

Lessons for owners planning a similar renovation

  • Move out if you can. A full renovation in an occupied apartment is slower, dustier and more stressful for everyone.
  • Get the building paperwork started first. Permit applications, insurance certificates and deposits can take time; nothing should be ordered against a start date that management has not approved.
  • Ask for a programme built around the building rules. A realistic contractor shows you where the noisy work falls and how quieter tasks fill the rest of the day.
  • Lock in selections early. Tiles, flooring, sanitaryware and kitchen finishes should be chosen before strip-out so they arrive in time.
  • Plan the electrical shutdown. Agree the date with building management and inform neighbours, and keep it short.
  • Insist on tested waterproofing. Ask how and when the bathroom membranes are flood-tested before tiling.

Planning checklist

  1. Confirm what your building permits and request its renovation application pack.
  2. Agree the scope room by room and list what stays.
  3. Collect contractor licence and insurance documents for the submission.
  4. Fix finishes and appliance allowances before work starts.
  5. Book the freight lift and agree the waste removal schedule.
  6. Schedule any DEWA disconnection with building management.
  7. Agree a snagging walk-through and handover documents before final payment.

Key takeaways

  • A full three-bedroom apartment renovation in Business Bay was completed in seven weeks with the owner living elsewhere.
  • Tower rules on noisy work, lift bookings and power shutdowns shape the programme as much as the scope does.
  • Grouping loud trades into permitted windows lets restricted hours be absorbed without delay.
  • Engineered timber, porcelain and properly tested waterproofing suit Dubai's climate and apartment living.

For a single point of contact on this kind of work, see our turnkey fit-out and renovation service, or compare with a smaller scope in our Downtown Dubai apartment kitchen and bathroom remodel.

Frequently asked questions

How long does a full three-bedroom apartment renovation take in Dubai?

This 150 m² apartment took seven weeks. Timelines depend on scope, building rules on working hours and how quickly finishes are selected, so a programme should be confirmed after a site survey.

Do I need building management approval to renovate my Business Bay apartment?

Yes, towers normally require a renovation application before work starts, usually with contractor licence and insurance documents. Check the current requirements with your building management or owners' association.

Can I stay in the apartment during a full renovation?

It is possible for smaller jobs, but for a full renovation covering the kitchen, bathrooms and flooring, moving out is usually faster, cleaner and safer. The owner on this project moved out for the duration.

Why does a renovation need a DEWA disconnection?

Upgrading a distribution board or reworking circuits requires the supply to be isolated safely. In a tower the shutdown is coordinated with building management and sometimes neighbouring units, and any change to connected load may need a DEWA application.

Is engineered timber suitable for Dubai apartments?

Yes, engineered timber is more stable than solid wood in air-conditioned homes and is commonly used in bedrooms and living areas, with porcelain in wet and high-traffic zones.

Plan your apartment renovation with FIXORA Decor

If you own an apartment in Business Bay or another Dubai tower and are planning a full renovation, FIXORA Decor can survey the space, check your building's rules and give you a realistic programme. Message us on WhatsApp at +971501962136, call +971 50 196 2136, or request a quote online.

图库

常见问题

This 150 m² apartment took seven weeks. Timelines depend on scope, building rules on working hours and how quickly finishes are selected, so a programme should be confirmed after a site survey.

Yes, towers normally require a renovation application before work starts, usually with contractor licence and insurance documents. Check the current requirements with your building management or owners' association.

It is possible for smaller jobs, but for a full renovation covering the kitchen, bathrooms and flooring, moving out is usually faster, cleaner and safer. The owner on this project moved out for the duration.

Upgrading a distribution board or reworking circuits requires the supply to be isolated safely. In a tower the shutdown is coordinated with building management and sometimes neighbouring units, and any change to connected load may need a DEWA application.

Yes, engineered timber is more stable than solid wood in air-conditioned homes and is commonly used in bedrooms and living areas, with porcelain in wet and high-traffic zones.