Al Zahia Villa Kitchen-Led Renovation, Sharjah

A kitchen-led renovation of a four-bedroom villa in Al Zahia, Sharjah: a new open family kitchen, enclosed dirty kitchen, laundry, pantry and refreshed ground floor, delivered by FIXORA Decor in ten weeks while the family stayed at home.

Quick answer

A kitchen-led renovation of a four-bedroom villa in Al Zahia, Sharjah: a new open family kitchen, enclosed dirty kitchen, laundry, pantry and refreshed ground floor, delivered by FIXORA Decor in ten weeks while the family stayed at home. Weekend gatherings with extended family mean several people cooking at once.

Last updated:

This kitchen renovation in Sharjah reorganised the ground floor of a four-bedroom Al Zahia villa around a new open family kitchen, an enclosed dirty kitchen, a laundry and a walk-in pantry. FIXORA Decor completed the work in ten weeks while the family continued to live upstairs, with a temporary kitchen set up in the majlis. This illustrative case study shows how a kitchen-led renovation can change the way a whole villa works, and what owners in Sharjah should plan for.

Kitchen renovation in Sharjah: the brief

The villa's original kitchen was a closed room at the back of the house, with limited worktop space, a small window and no separate area for heavy cooking. The family of six cooks every day, often in large quantities, with frying, grilling and slow-cooked dishes that fill the house with smells. Weekend gatherings with extended family mean several people cooking at once. The washing machine sat in the kitchen, and there was nowhere to store bulk shopping.

The owners asked for:

  • An open, bright family kitchen with an island where children can do homework while dinner is prepared
  • A separate, fully enclosed dirty kitchen for heavy cooking, with strong extraction
  • A laundry room so washing no longer happens in the kitchen
  • A walk-in pantry for rice, oil, spices and bulk purchases
  • Refreshed flooring and lighting across the ground floor so the new kitchen does not look out of place
  • A fixed budget and a program that allowed the family to stay in the villa

Challenges

Living in the house during works

Moving out was not affordable or practical with four children at school. The family needed a way to cook throughout the project, safe routes through the house and quiet evenings. A temporary kitchen with a sink connection, a two-zone induction hob, a fridge and a microwave was set up in the majlis, and the work zone was sealed off.

Smells and extraction

Open kitchens only work if heavy cooking happens elsewhere. The dirty kitchen needed a powerful extract duct to the outside, without disturbing the neighbors or breaching community rules on external appearance. The duct route was planned through the side wall to a discreet louvre at high level.

Removing a wall

Opening the kitchen to the living room meant removing a wall that carried a small beam over part of its length. A structural engineer confirmed which section could be removed and specified a new beam for the opening.

Gas and safety

The original kitchen used a gas cylinder. The family agreed to move to induction in the open kitchen and keep gas only in the dirty kitchen, with a proper external cylinder enclosure, approved regulator and leak detection.

Approvals obtained

Kitchen renovations that change walls, drainage and gas installations need more than a contractor and a design. In general terms, the approvals for this villa were:

  • Community developer NOC: confirmation that the external extract louvre and gas enclosure met the community's appearance guidelines
  • Municipality permit for structural and MEP changes: drawings of the wall removal and new beam, drainage and electrical changes, submitted by a licensed consultant
  • Civil defense requirements for gas: a licensed gas contractor installed and certified the gas line, regulator and detection
  • Utility coordination: confirmation with the electricity and water authority that the supply could handle induction hobs and new appliances

Approvals took around three weeks. Requirements and fees in Sharjah change, so owners should confirm the current process with the developer and the municipality before work starts.

Design approach

The renovation was planned around how the family cooks, not around a showroom picture.

  • Two kitchens, two roles: the open kitchen handles breakfast, salads, baking, coffee and serving; the dirty kitchen handles frying, grilling, large pots and washing up after gatherings
  • Working triangle for several cooks: a large island with prep sink, a long run with the main sink by the window, and tall units for ovens and fridge, so two or three people can work without crossing paths
  • Storage that matches the shopping: deep drawers for pots, a full-height pull-out pantry by the fridge and a walk-in pantry with adjustable shelving for bulk goods
  • Laundry with outdoor access: a laundry room by the side door, with washing and drying machines stacked and a door to the drying yard
  • Easy to clean: large-format tiles, quartz worktops, handleless doors and a seamless splashback
  • Light: a larger window, warm under-cabinet lighting and pendants over the island

Scope of work

  • Set up of a temporary kitchen in the majlis and sealing of the work zone
  • Strip-out of the old kitchen, tiles, units and part of the ground-floor flooring
  • Removal of the dividing wall and installation of a new beam under engineer supervision
  • Enlarging the kitchen window opening
  • New partitions to form the dirty kitchen, laundry and pantry
  • Drainage and water supply for the island sink, dirty kitchen and laundry
  • Electrical rewiring of the kitchen area with dedicated circuits for appliances
  • Gas line, regulator, external cylinder enclosure and leak detector for the dirty kitchen
  • Extract ductwork and external louvre for the dirty kitchen hood
  • Waterproofing in the dirty kitchen and laundry
  • Ground-floor porcelain flooring, skirting and painting
  • Main kitchen, dirty kitchen, laundry and pantry joinery
  • Worktops, splashbacks, sinks, taps and appliance installation
  • Gypsum ceiling with downlights in the open kitchen
  • Cleaning, testing and handover

Materials and finishes

AreaMaterialWhy
Open kitchen unitsLacquered MDF, moisture resistant, soft-close hardwareDurable, easy to wipe and quiet in daily use
Island and worktopsQuartz, 20 mm, with eased edgesResists stains from turmeric, saffron and oil
SplashbackSingle porcelain slabNo grout lines to clean
Dirty kitchenStainless steel worktops, full-height wall tiles, heavy-duty hoodBuilt for heat, oil and frequent washing
LaundryMelamine units, porcelain floor with floor drainPractical and water resistant
PantryAdjustable powder-coated shelvingFlexible for bulk storage
Ground floorLarge-format matte porcelainContinuous, durable and cool underfoot
LightingLED downlights, under-cabinet strips, pendantsLayered light for cooking and family time

Program and phasing

WeeksPhaseActivities
1–3Design and approvalsMeasurements, design, NOC and permit, joinery orders
4Preparation and strip-outTemporary kitchen, sealing, demolition
5StructureWall removal, new beam, enlarged window
6–7Services and partitionsDrainage, electrical, gas, extraction, partitions
8FinishesWaterproofing, flooring, ceilings, painting
9–10Kitchen installationJoinery, worktops, appliances, testing and handover

Noisy work such as wall removal and tile cutting was done during school hours, with tools down before the children came home.

Quality and safety

  • Dust sheets and a zipped dust barrier between the work area and the rest of the house
  • Engineer-approved propping during the wall removal
  • Gas line pressure tested and certified by a licensed gas contractor
  • Waterproofing tests in the dirty kitchen and laundry before tiling
  • Electrical tests and labeled circuits for every appliance
  • Daily cleaning of shared areas and safe storage of tools away from children
  • A WhatsApp group with the site supervisor for daily updates and questions

Handover and aftercare

At handover, the family received appliance manuals and warranties, the gas certificate, a simple care guide for quartz and lacquered surfaces, and the approval documents. The site supervisor showed the family how to clean the hood filters and adjust drawer runners.

FIXORA Decor returned after one month to adjust a few doors and check the extraction performance during a busy cooking day. A second visit after six months checked the silicone joints and the gas installation. The family later added a coffee station in the open kitchen, which was installed in one visit.

Results

  • Cooking smells stay in the dirty kitchen, so the open kitchen and living room stay fresh
  • Several family members can cook at once without getting in each other's way
  • Laundry moved out of the kitchen into its own room with outdoor access
  • Bulk shopping stored neatly in a walk-in pantry
  • A bright, open ground floor that has become the center of family life

Kitchen-led villa renovations in Sharjah and Dubai typically fall in an indicative 2026 range of around AED 60,000 to AED 180,000, depending on whether walls are moved, the size of the joinery, worktop material, appliances and the extent of flooring, plus 5% VAT. A detailed quote follows a site visit and design brief.

Lessons for other owners

  • Design for how you cook. If your cooking is heavy, a dirty kitchen is what makes an open kitchen possible.
  • Plan extraction early. The duct route affects the layout, the external look and the approvals.
  • Separate the laundry. It frees worktops, storage and noise from the kitchen.
  • Make a temporary kitchen. A simple set-up lets families stay at home.
  • Use certified gas contractors. Gas installations must be done and certified properly.
  • Refresh the surrounding floor. A new kitchen next to old tiles looks unfinished.

Key takeaways

  • A kitchen-led renovation in Sharjah can transform how a villa works in around ten weeks.
  • The open kitchen and dirty kitchen combination suits large UAE families.
  • Wall removal and gas work need approvals and licensed specialists.
  • Good storage and a separate laundry matter as much as finishes.

Planning a new kitchen?

FIXORA Decor designs and renovates kitchens for villas and apartments in Sharjah, Dubai and Abu Dhabi. Send photos and measurements on WhatsApp at +971501962136, call +971 50 196 2136 or request a quote.