On this page
Quick answer
Turnkey fit-out and renovation in Dubai: design to handover for villas, apartments, offices, retail and hospitality, with one accountable team across all 15 trades. A turnkey fit-out in Dubai means one company takes your project from concept and approvals through construction to a finished, ready-to-use space.
Key facts
- Our turnkey projects start from AED 25,000.
Last updated:
All types of fit-out, one accountable team
A fit-out involves many trades that have to arrive in the right order. We manage the whole sequence under one contract, so you deal with one team from the first drawing to the last snag.
Who we fit out for
- Homes. Villa and apartment renovations: living rooms and TV walls, entrances, kitchens, bathrooms, wardrobes and flooring.
- Offices. Partitions, meeting rooms, reception counters, ceilings, lighting, data and power, carpet tiles or LVT.
- Retail. Shopfronts, display joinery, lighting, cash desks and back-of-house storage, built to mall or landlord requirements.
- Restaurants and cafes. Seating, bars and counters, kitchen-ready walls and floors, extraction coordination and durable finishes.
- Clinics. Hygienic surfaces, treatment rooms, reception, plumbing points and joinery planned around clinical workflow.
- Salons and spas. Stations, wash areas, mirrors, lighting and water-resistant floors.
What is included
- Design, drawings and 3D views where needed
- Demolition and removal of the old interior
- Gypsum partitions and ceilings
- Electrical, plumbing and AC modifications
- Joinery: units, counters, wardrobes, doors
- Wall panels and sheet boards
- Flooring and skirting
- Painting and decorative finishes
- Final cleaning and handover

Approvals
Most buildings and communities require a no-objection certificate before work starts, and commercial fit-outs often need authority approvals as well. We prepare the applications and drawings and tell you early which approvals apply to your property, since they affect the start date.
The process
- Brief and site visit. We listen, measure and photograph.
- Design and quotation. Layout, material selection and an itemized quotation with VAT shown separately.
- Approvals. NOC and permit applications.
- Construction. Trades in sequence, with progress photos.
- Snagging and handover. You walk the site with us, we close the list, you sign off.

Realistic timelines
Duration depends on area, scope and approvals more than on anything else. A single room or a small shop can be a matter of weeks. A full villa or an office floor takes longer, and approval lead times sit outside the construction program. We give you a written program with the quotation and update it if the scope changes.
After handover
Keep the handover file with paint codes, material references and warranty terms. Small adjustments in the first weeks, such as a door that needs easing, are normal, and we come back for them. Details are in the workmanship warranty.
Start with one wall
Not ready for a full fit-out? Many clients start with a single feature. Draw a TV wall or foyer in the design planner or request a quote.
What's included
- One contract and one point of contact
- Design, drawings and material selection
- NOC and permit paperwork prepared for you
- Partitions, ceilings, joinery, panels, flooring, paint and MEP
- A written program with progress photos
- Snag list, handover and workmanship warranty
Gallery
Frequently asked questions
Yes. We fit out villas and apartments as well as offices, shops, restaurants, clinics and salons.
We prepare the applications and drawings and coordinate with the building management or authority. Fees charged by third parties are shown separately in the quotation.
For a single room or a feature wall, usually yes. For a full renovation it is more comfortable and faster to move out for the dusty stages. We will advise honestly.
You receive an itemized quotation. If you change the scope during the work, the change is priced and agreed in writing before it is done.
Yes, including night and weekend shifts where the landlord requires them.



