Projects & case studies
Selected work by FIXORA Decor in Dubai, with photos and details.

Luxury Apartment Makeover — Dubai Marina
Luxury apartment makeover in Dubai Marina: a dated 1,850 sq ft two-bedroom reimagined in six weeks with an open-plan kitchen, custom built-in storage, a feature LED wall, layered lighting, full repaint and SPC flooring.
- Area:
- 1,850 sq ft
- Duration:
- 6 weeks

Corporate Office Revamp — JLT
Corporate office revamp in JLT: a 4,200 sq ft office for a finance company transformed into a collaborative, brand-led workspace in seven weeks, with acoustic panels, ergonomic workstations, brand graphics and glass meeting rooms, with zero downtime.
- Area:
- 4,200 sq ft
- Duration:
- 7 weeks

Boutique Retail Store — Al Barsha
Boutique retail store fit-out in Al Barsha: a 950 sq ft fashion boutique blending modern fixtures with warm natural wood, with custom display shelving, ambient lighting and fitting room and cash desk joinery, completed in four weeks.
- Area:
- 950 sq ft
- Duration:
- 4 weeks

Executive Villa Renovation — Arabian Ranches
Arabian Ranches villa renovation: a complete 5,600 sq ft executive villa transformation with a kitchen extension and island, majlis and formal dining redesign, marble and parquet flooring, landscaping and smart lighting with CCTV, in 12 weeks.
- Area:
- 5,600 sq ft
- Duration:
- 12 weeks

Arabian Ranches Villa Full Renovation
Arabian Ranches villa full renovation: a five-bedroom, 480 m² villa with a new kitchen, four refitted bathrooms, engineered timber and porcelain floors and a full repaint, delivered in nine weeks within the agreed budget.
- Area:
- 480 m²
- Duration:
- 9 weeks

Dubai Marina Apartment Makeover for Re-Letting
Dubai Marina apartment makeover for re-letting: a 95 m² two-bedroom unit refreshed between tenancies with a full repaint, new vinyl flooring, bathroom and kitchen fitting updates and a deep clean, ready for new tenants in three weeks including permit lead time.
- Area:
- 95 m²
- Duration:
- 3 weeks

Business Bay Apartment Full Renovation
Business Bay apartment renovation: a 150 m² three-bedroom home fully renovated in seven weeks, with a new kitchen, three refitted bathrooms, engineered timber and porcelain flooring, electrics and a repaint, all within tower management's approved hours.
- Area:
- 150 m²
- Duration:
- 7 weeks

DIFC Law Firm Office Fit-Out
DIFC law firm office fit-out: a 650 m² Category A to B fit-out with acoustic meeting rooms, partner offices, reception joinery and AV, delivered by FIXORA Decor in ten weeks using after-hours working to avoid disturbing other tenants in the tower.
- Area:
- 650 m²
- Duration:
- 10 weeks

Al Quoz Warehouse-to-Office Conversion
Al Quoz warehouse-to-office conversion: half of a trading company's warehouse turned into a two-story office with a steel mezzanine, full MEP, insulation and fire systems, delivered in fifteen weeks under Dubai Municipality change-of-use approval.
- Area:
- 1,200 m²
- Duration:
- 15 weeks

Full-service restaurant fit-out in Business Bay
Restaurant fit-out in Business Bay: a 320 m² full-service restaurant in a tower, delivered in 14 weeks with an open show kitchen, dining room and terrace, and Dubai Municipality and Civil Defence approvals managed from design stage.
- Area:
- 320 m²
- Duration:
- 14 weeks

Dental clinic fit-out in Dubai Healthcare City
Dental clinic fit-out in Dubai Healthcare City: a 210 m² multi-chair clinic delivered in ten weeks, with a lead-lined X-ray room, infection-control finishes, medical gas and compressed air first-fix and a sterilization room for autoclaves.
- Area:
- 210 m²
- Duration:
- 10 weeks

Nursery fit-out in Arabian Ranches
Nursery fit-out in Arabian Ranches: a 650 m² community unit converted into an early years setting in 12 weeks, with child-safe materials, rounded joinery, low-level fittings and a secure outdoor play area that passed its child-safety inspection.
- Area:
- 650 m²
- Duration:
- 12 weeks

Annual maintenance contract for a 40-villa community
Annual maintenance contract for a 40-villa gated community in Dubai: one renewable 12-month AMC covering twice-yearly AC servicing, plumbing and electrical checks, a rolling painting cycle and defined call-out response times.
- Area:
- 40 villas
- Duration:
- 12-month contract, renewable

Al Furjan Villa Ground-Floor Extension
A 38 m² ground-floor extension to a four-bedroom Al Furjan villa, adding a family room and guest suite, delivered by FIXORA Decor with developer NOC, building permit, structure, MEP and interior finishes in fourteen weeks.
- Area:
- 38 m² extension
- Duration:
- 14 weeks

Palm Jumeirah Penthouse Full Fit-Out
A complete interior fit-out of a 420 m² four-bedroom penthouse on Palm Jumeirah, with a reconfigured layout, show kitchen and dirty kitchen, stone bathrooms, bespoke joinery and terrace upgrade, delivered by FIXORA Decor in sixteen weeks.
- Area:
- 420 m²
- Duration:
- 16 weeks

Business Bay Full Office Floor Fit-Out for an Engineering Consultancy
A shell-and-core office fit-out of a full floor in a Business Bay tower for an engineering consultancy: open studio, 9 meeting rooms, a plotting and model room, a staff pantry and a client suite, delivered in 15 weeks with full authority approvals.
- Area:
- 1,450 m² (approx. 15,600 sq ft)
- Duration:
- 15 weeks

Dubai Healthcare City Multi-Specialty Outpatient Clinic Fit-Out
A 420 m² multi-specialty outpatient clinic in Dubai Healthcare City: 8 consultation rooms, a minor procedure room, sterilization, a small lab collection area and a family-friendly waiting area, delivered in 16 weeks with healthcare regulator and Civil Defence approvals.
- Area:
- 420 m²
- Duration:
- 16 weeks

Beachfront restaurant refurbishment on Palm Jumeirah
An illustrative restaurant refurbishment on Palm Jumeirah: a 420 m² indoor dining room and 260 m² sea-facing terrace renewed in ten weeks during the summer low season, with a new bar, shading, corrosion-resistant finishes and a refreshed kitchen line.
- Area:
- 680 m² (420 m² indoor, 260 m² terrace)
- Duration:
- 10 weeks

Hotel guest room refurbishment in Downtown Dubai: 64 rooms floor by floor
An illustrative hotel room refurbishment in Downtown Dubai: 64 guest rooms and corridors renewed floor by floor while the hotel stayed open, with acoustic controls, a mock-up room, new bathrooms and a 13-day turnaround per floor.
- Area:
- 64 rooms and 4 corridors (approx. 2,600 m²)
- Duration:
- 6 months including mock-up room

Classroom & Library Refurbishment — Al Quoz
Classroom and library refurbishment in Al Quoz: twelve classrooms and a library upgraded in a 6-week summer break with acoustic ceilings, homogeneous vinyl flooring, whiteboard walls and an LED retrofit saving 38% energy.
- Area:
- 6,800 sq ft
- Duration:
- 6 weeks (summer break)

Restaurant Fit-Out — Saffron Kitchen, Jumeirah
Restaurant fit-out in Jumeirah for Saffron Kitchen: a 2,300 sq ft full F&B fit-out delivered in eight weeks, with commercial kitchen extraction, Dubai Municipality food control approvals, terrazzo floors, a bespoke bar and banquette seating, and brass-accent joinery.
- Area:
- 2,300 sq ft
- Duration:
- 8 weeks

Dental Clinic Reception & Treatment Rooms — Healthcare City
Dental clinic fit-out in Dubai Healthcare City: a 1,400 sq ft reception and treatment room project delivered in five weeks, with antibacterial wall cladding, hidden MEP, warm reception joinery and acoustic gypsum partitions.
- Area:
- 1,400 sq ft
- Duration:
- 5 weeks

Dubai Hills Estate Villa Kitchen & Bathroom Remodel
Dubai Hills Estate villa kitchen and bathroom remodel: a kitchen and three bathrooms renewed with new joinery, tiling, sanitaryware and re-waterproofing in five weeks, while a family of five stayed in the villa with no unplanned downtime.
- Area:
- 420 m²
- Duration:
- 5 weeks

Jumeirah Villa Extension and Refurbishment
Villa extension in Jumeirah, Dubai: a 60 m² single-story rear extension adding a family room and guest suite to a 480 m² villa, matched to the existing roofline and render, with adjoining rooms refurbished and Dubai Municipality approvals secured first. Built in 13 weeks.
- Area:
- 480 m² (including a 60 m² extension)
- Duration:
- 13 weeks

Al Barsha Villa Painting & Flooring Refresh
Al Barsha villa painting and flooring refresh: a full repaint and new vinyl flooring in the living areas of an occupied 360 m² family villa, completed room by room in twelve days without the family moving out.
- Area:
- 360 m²
- Duration:
- 12 days

Mirdif Villa Maid's Room Conversion
Maid's room conversion in a Mirdif villa: FIXORA Decor turned an unused room into a home office in two weeks, with vinyl flooring, built-in desk and shelving, power, data, LED lighting, a relocated AC outlet and a refreshed cloakroom.
- Area:
- 16 m²
- Duration:
- 2 weeks

The Springs Villa Majlis Fit-Out
Majlis fit-out in a villa in The Springs, Dubai: a 45 m² reception room turned into a formal majlis with raised seating platforms, a stepped ceiling with cove lighting, serving joinery, feature paneling and new tiling in three weeks.
- Area:
- 45 m²
- Duration:
- 3 weeks

Palm Jumeirah Villa Outdoor & Pool Deck Upgrade
Palm Jumeirah villa outdoor upgrade: a 95 m² pool deck and garden on a beachfront villa renewed in five weeks with new decking, a shaded seating structure, IP-rated lighting and adjusted irrigation, working within Trakhees approval and community access hours.
- Area:
- 95 m² garden and pool deck
- Duration:
- 5 weeks

Damac Hills Villa Full Renovation
Damac Hills villa renovation: a 510 m² four-bedroom resale villa fully renovated in ten weeks over the summer, with a new kitchen, four bathrooms, engineered timber and porcelain flooring, doors, joinery and a full repaint, in time for move-in.
- Area:
- 510 m²
- Duration:
- 10 weeks

Mudon Villa Kitchen & Bathroom Remodel
Mudon villa kitchen and bathroom remodel: FIXORA Decor replaced original handover fittings with a better kitchen layout and two re-waterproofed, retiled bathrooms in four weeks while the owners stayed in the townhouse-style villa.
- Area:
- 390 m²
- Duration:
- 4 weeks

JLT Apartment Painting & Flooring Refresh
JLT apartment painting and flooring refresh: an 85 m² one-bedroom repainted throughout and re-floored with vinyl in the living and dining area in eight days, within building permitted hours, ready for a new tenant with no gap in occupancy.
- Area:
- 85 m²
- Duration:
- 8 days

Downtown Dubai Apartment Kitchen & Bathroom Remodel
Downtown Dubai apartment kitchen and bathroom remodel: an open-plan kitchen and two bathrooms in a 110 m² two-bedroom apartment, with re-waterproofing, new joinery and tiling, and building permit and DEWA disconnection coordinated by FIXORA Decor in four weeks.
- Area:
- 110 m²
- Duration:
- 4 weeks

JVC Apartment Makeover for Re-Letting
JVC apartment makeover for a landlord: FIXORA Decor repainted, resealed the bathroom, refreshed the kitchenette and polished the floor of a studio in two weeks, so it could be relisted fast with minimal void period.
- Area:
- 70 m²
- Duration:
- 2 weeks

Dubai Creek Harbour Apartment Balcony Upgrade
Dubai Creek Harbour balcony upgrade: a 16 m² apartment balcony turned into usable outdoor space with weather-resistant decking, retractable shade, built-in planters and an outdoor power point, approved against the building's facade guidelines and completed in ten days.
- Area:
- 16 m² balcony
- Duration:
- 10 days

Business Bay Trading Company Headquarters Fit-Out
Business Bay office fit-out for a trading company's regional HQ: 900 m² across two connected floors, with partitions, glazing, ceilings, full MEP upgrade, structured cabling, branded reception and pantry, delivered in twelve weeks.
- Area:
- 900 m²
- Duration:
- 12 weeks

Dubai Media City Tech Start-Up Office Fit-Out
Dubai Media City start-up office fit-out: a 320 m² budget-conscious office for a growing tech company, with open-plan desking, structured cabling, a glazed meeting pod, phone booth and breakout area, delivered with Dubai Development Authority approval in seven weeks.
- Area:
- 320 m²
- Duration:
- 7 weeks

JLT Co-Working Floor Fit-Out
Co-working fit-out in JLT, Dubai: a 1,100 m² full floor with hot-desking, private suites with acoustic glazing, phone booths, a café-style common area, access control and electrical and data upgraded for high density, completed in ten weeks.
- Area:
- 1,100 m²
- Duration:
- 10 weeks

Dubai Silicon Oasis Technology Office Fit-Out
Dubai Silicon Oasis tech office fit-out: a 500 m² office with a dedicated server room, open engineering bullpen, meeting rooms and a glazed client demo area, approved by the Dubai Silicon Oasis Authority and built in eight weeks.
- Area:
- 500 m²
- Duration:
- 8 weeks

Dubai South Logistics Company Office Fit-Out
Dubai South office fit-out for a logistics company: a 700 m² administrative office with operations desking, a glazed dispatch control room overlooking the warehouse floor and meeting facilities, built in nine weeks around live operations.
- Area:
- 700 m²
- Duration:
- 9 weeks

Business Bay Clinic Group Administrative Office Fit-Out
Clinic admin office fit-out in Business Bay: a 260 m² back-office for a multi-branch clinic group, with management offices, open-plan desking, a boardroom and a fire-rated, access-controlled records room delivered in six weeks.
- Area:
- 260 m²
- Duration:
- 6 weeks

DIFC Co-Working Serviced Office Fit-Out
DIFC serviced office and co-working fit-out: a 950 m² premium floor with acoustic private suites, glazed meeting rooms, a members' lounge, business-grade pantry and reinforced electrical and data infrastructure, delivered by FIXORA Decor in eleven weeks.
- Area:
- 950 m²
- Duration:
- 11 weeks

JLT Law Firm Office Relocation Fit-Out
Law firm office relocation fit-out in JLT, Dubai: 420 m² of partner offices, meeting rooms, reception and open-plan paralegal space delivered in eight weeks against a fixed lease handover, with the move completed over a single weekend.
- Area:
- 420 m²
- Duration:
- 8 weeks

Dubai Silicon Oasis Tech Start-Up Office Fit-Out
Start-up office fit-out in Dubai Silicon Oasis: a compact, cost-effective 380 m² office with flexible desking, a glazed meeting room and a hardware testing bay with reinforced power, delivered in six weeks.
- Area:
- 380 m²
- Duration:
- 6 weeks

Dubai Media City Trading Company Office Fit-Out
Dubai Media City office fit-out for a trading company: a 540 m² regional office with partitioned management offices, an open-plan sales floor and a glazed client meeting suite, DDA-approved and completed in eight weeks through the summer.
- Area:
- 540 m²
- Duration:
- 8 weeks

Boutique fashion store fit-out near Dubai Mall
Boutique fit-out near Dubai Mall: a shell-and-core fashion boutique in the Downtown Dubai mall precinct plus a glazed street-retail unit, delivered in nine weeks with overnight works, landlord and developer approvals and Civil Defence sign-off.
- Area:
- 95 m² and 70 m²
- Duration:
- 9 weeks

Mall perfume kiosk design and fit-out
Mall perfume kiosk fit-out in Deira, Dubai: a 9 m² freestanding island kiosk designed to the mall's kiosk manual, fabricated off-site in modular panels over three weeks and installed, connected and signed off in a single overnight slot.
- Area:
- 9 m²
- Duration:
- 1 overnight installation (3 weeks design and fabrication)

Mobile phone shop refurbishment in Deira
Mobile phone shop refurbishment in Deira: a 60 m² ground-floor unit given secure glazed counters, a new roller shutter, façade repaint, LED lighting and full rewiring over four phased weeks while the shop kept trading.
- Area:
- 60 m²
- Duration:
- 4 weeks

Furniture showroom fit-out in Al Quoz
Furniture showroom fit-out in Al Quoz: a 950 m² warehouse converted for a furniture importer in 11 weeks, with a new mezzanine office, polished concrete floor, layered display lighting, a safe goods-receiving area and Civil Defence change-of-use approval.
- Area:
- 950 m²
- Duration:
- 11 weeks

Independent café fit-out in JLT
Café fit-out in JLT: a 110 m² ground-floor unit turned into an independent café in eight weeks, with a compact kitchen to Dubai Municipality food premises requirements, extraction to the building riser, a grease trap and Civil Defence approval.
- Area:
- 110 m²
- Duration:
- 8 weeks

Cloud kitchen facility fit-out in Al Quoz
Cloud kitchen fit-out in Al Quoz: a 480 m² multi-brand delivery facility completed in ten weeks, with segregated cooking stations, shared extraction and grease trap sized for peak load, food-grade finishes and a separate rider holding area.
- Area:
- 480 m²
- Duration:
- 10 weeks

Hotel apartment building refurbishment in Barsha Heights
Hotel apartment refurbishment in Barsha Heights, Dubai: 180 guest units and corridors refreshed over 7 months, floor by floor, while the building stayed open, with new finishes, water-efficient fittings, fire-rated corridor doors and no guest complaints logged.
- Area:
- 180 guest units
- Duration:
- 7 months, phased

Hair and beauty salon fit-out in Jumeirah
Salon fit-out in Jumeirah, Dubai: a 150 m² ladies' hair and beauty salon delivered in 6 weeks, with wash bay plumbing resized for continuous use, private sound-dampened treatment rooms, chemical-resistant finishes and dedicated circuits for styling tools.
- Area:
- 150 m²
- Duration:
- 6 weeks

Boutique gym fit-out in Motor City
Gym fit-out in Motor City, Dubai: a 260 m² boutique fitness studio delivered in 8 weeks, with a structural load assessment, reinforced rubber-matted training floor, upgraded showers and air conditioning resized for high-intensity classes.
- Area:
- 260 m²
- Duration:
- 8 weeks

Neighborhood bakery fit-out in Mirdif
Bakery fit-out in Mirdif: a 130 m² neighborhood bakery and patisserie with a production area, oven extraction designed for heat and steam, display chillers and Dubai Municipality food premises sign-off, completed in six weeks.
- Area:
- 130 m²
- Duration:
- 6 weeks

General practice clinic fit-out in Al Nahda, Sharjah
GP clinic fit-out in Al Nahda, Sharjah: a 240 m² general practice clinic with consultation rooms, a minor procedures room, nurse station and pharmacy counter, infection-control finishes and a compliant medical waste room, delivered in nine weeks.
- Area:
- 240 m²
- Duration:
- 9 weeks

Physiotherapy center fit-out in JVC
Physiotherapy center fit-out in JVC, Dubai: a 300 m² rehabilitation center delivered in nine weeks with a reinforced gym floor, acoustically separated treatment rooms, infection-control finishes and a plumbing allowance for a future hydrotherapy pool.
- Area:
- 300 m²
- Duration:
- 9 weeks

Vocational training center fit-out in Knowledge Park
Training center fit-out in Dubai Knowledge Park: a 540 m² vocational center with combinable classrooms, acoustic separation, a durable skills workshop and AV-ready teaching spaces, delivered in 10 weeks and ready for the first term.
- Area:
- 540 m²
- Duration:
- 10 weeks

Community pharmacy fit-out in Al Karama
Pharmacy fit-out in Al Karama, Dubai: an 85 m² ground-floor community pharmacy delivered in five weeks with a secure controlled-medicine room, temperature-monitored storage, a private consultation point and infection-control dispensary finishes.
- Area:
- 85 m²
- Duration:
- 5 weeks

Veterinary clinic fit-out in Al Barsha
Veterinary clinic fit-out in Al Barsha, Dubai: a 260 m² small-animal clinic with a surgical theater, radiation-shielded X-ray room, boarding kennels and consultation rooms, delivered in 10 weeks with full authority sign-off.
- Area:
- 260 m²
- Duration:
- 10 weeks

Annual maintenance contract for a 12-floor office tower
Annual maintenance contract for a 12-floor Dubai office tower: shared chiller and AHU servicing, common-area fabric upkeep, electrical safety checks, tenant-coordinated response times and monthly reporting to building management.
- Area:
- 12 floors
- Duration:
- 12-month contract, renewable

Facility maintenance for a logistics warehouse in DIP
Warehouse facility maintenance in Dubai Investments Park: a renewable 12-month contract for a logistics warehouse covering dock levellers, roller shutters, high-bay lighting, roof drainage and electrical servicing, with priority response for loading bay faults.
- Area:
- 1 warehouse facility
- Duration:
- 12-month contract, renewable

Landlord maintenance program for 60 apartments in International City
Landlord maintenance program for 60 apartments in International City: reactive repairs by fault severity, turnover refurbishment between Ejari leases, photo condition records, pre-summer AC servicing and monthly reporting.
- Area:
- 60 apartments
- Duration:
- Ongoing programme

Hotel apartment annual maintenance contract
Hotel apartment AMC in Dubai: a 12-month renewable maintenance contract covering 150 guest units and common areas, with preventive AC servicing scheduled around the booking calendar, guest-facing response tiers and no bookings relocated for maintenance.
- Area:
- 150 guest units
- Duration:
- 12-month contract, renewable

School summer refurbishment program
School summer refurbishment program in Dubai: an 8-week, full-campus program of low-odor repainting, flooring repairs, AC servicing and joinery repairs, completed and snagged before the first day of term.
- Area:
- Full campus
- Duration:
- 8-week summer programme

Multi-site maintenance contract for a retail chain
Multi-site retail maintenance in Dubai: one renewable 12-month contract replacing separate arrangements across a retail chain's branches, with tiered response times, standardized preventive AC servicing, per-branch access protocols and a single monthly report for head office.
- Area:
- Multi-site
- Duration:
- 12-month contract, renewable

Mosque renovation and maintenance program
Mosque renovation and maintenance in Dubai: prayer hall flooring, lighting, ablution facilities and air conditioning renewed over six weeks around the five daily prayers and Friday congregation, followed by ongoing upkeep.
- Area:
- 1 community mosque
- Duration:
- 6 weeks renovation, ongoing maintenance

Labor accommodation refurbishment in Al Quoz
Labor accommodation refurbishment in Al Quoz: dormitories, shared kitchens, ablution blocks, electrical and fire safety upgraded to authority standards over a phased 16-week program, with no resident displaced off-site.
- Area:
- 1 accommodation facility
- Duration:
- 16 weeks, phased

Khalifa City Villa Majlis Build, Abu Dhabi
A new standalone 64 m² majlis with a guest washroom and serving pantry in the garden of a Khalifa City villa in Abu Dhabi, built by FIXORA Decor in eighteen weeks with permits, structure, MEP, carpentry and traditional detailing.
- Area:
- 64 m²
- Duration:
- 18 weeks

Downtown Dubai Two-Apartment Combination
Two adjacent apartments in a Downtown Dubai tower combined into one 265 m² four-bedroom family home with a single entrance, new kitchen, majlis-style living room and five bathrooms, delivered by FIXORA Decor in fifteen weeks after approvals.
- Area:
- 265 m²
- Duration:
- 15 weeks on site (plus 8 weeks approvals)

Arabian Ranches 3 Townhouse Pool and Garden Landscaping
A compact 3.5 × 7 m plunge pool, shaded seating deck, outdoor kitchen and low-water planting for a townhouse garden in Arabian Ranches 3, designed and built by FIXORA Decor in eleven weeks with developer NOC and permits.
- Area:
- 95 m² garden
- Duration:
- 11 weeks

Al Zahia Villa Kitchen-Led Renovation, Sharjah
A kitchen-led renovation of a four-bedroom villa in Al Zahia, Sharjah: a new open family kitchen, enclosed dirty kitchen, laundry, pantry and refreshed ground floor, delivered by FIXORA Decor in ten weeks while the family stayed at home.
- Area:
- 72 m² ground-floor zone
- Duration:
- 10 weeks

Dubai Hills Estate Villa Smart-Home Retrofit
A smart-home retrofit of a five-bedroom Dubai Hills Estate villa: lighting scenes, motorised curtains, AC zoning, door entry, CCTV, leak detection, whole-house Wi-Fi and energy monitoring, installed by FIXORA Decor in seven weeks with minimal disruption.
- Area:
- 560 m²
- Duration:
- 7 weeks

The Valley Off-Plan Townhouse Handover Upgrade
A post-handover upgrade of a new off-plan three-bedroom townhouse in The Valley, Dubai: snagging support, kitchen upgrade, wardrobes, lighting, flooring, garden shade and a maid's room refresh, delivered by FIXORA Decor in eight weeks before move-in.
- Area:
- 210 m²
- Duration:
- 8 weeks

DIFC Law Firm Office Expansion and Live Refurbishment
A DIFC law firm took an adjoining unit and refurbished its existing office while staying open: new partner offices, a hearing-ready boardroom, secure file storage and a reception upgrade, phased over 12 weeks of mostly after-hours work.
- Area:
- 860 m² total (320 m² expansion + 540 m² refurbishment)
- Duration:
- 12 weeks, phased

Jumeirah Specialty Café Fit-Out with Shaded Terrace
A 140 m² specialty coffee café on a Jumeirah street-retail strip, with a 60 m² shaded terrace, open coffee bar, small hot kitchen, food safety and Civil Defence approvals, delivered in 11 weeks for a first-time café owner.
- Area:
- 140 m² indoor + 60 m² terrace
- Duration:
- 11 weeks

JLT Hair and Beauty Salon Fit-Out with Treatment Rooms
A 185 m² hair and beauty salon on the ground floor of a JLT tower: 10 styling stations, 4 backwash units, nail bar, 3 treatment rooms, staff room and laundry, delivered in 10 weeks with free zone, Civil Defence and health approvals.
- Area:
- 185 m²
- Duration:
- 10 weeks

Al Quoz Industrial Unit to Strength and Conditioning Gym Conversion
A 650 m² Al Quoz industrial unit converted into a strength and conditioning gym with lifting platforms, turf sled track, mezzanine studio, changing rooms and serious cooling, delivered in 13 weeks.
- Area:
- 650 m² + 120 m² mezzanine
- Duration:
- 13 weeks

Dubai Silicon Oasis Co-Working Center Fit-Out with Meeting Suites
A 980 m² co-working center in Dubai Silicon Oasis with hot desks, dedicated desks, 14 private offices, bookable meeting suites, phone booths, a podcast room and a community kitchen, delivered in 14 weeks under free zone approvals.
- Area:
- 980 m²
- Duration:
- 14 weeks

Dubai Pharmacy Chain Store Refresh Program Across Six Branches
A rolling refresh of six community pharmacy branches across Dubai, from Al Barsha to Mirdif, with new shelving, dispensing counters, counseling corners, lighting and signage, delivered branch by branch overnight while each pharmacy kept trading.
- Area:
- 6 branches, 70–160 m² each
- Duration:
- 12 weeks programme, 3–5 nights per branch

Specialty coffee kiosk fit-out in an Al Reem Island mall, Abu Dhabi
An illustrative mall kiosk fit-out for a specialty coffee concept on Al Reem Island, Abu Dhabi: a 14 m² island unit with a compact bar, drainage and power run under a live mall floor, built entirely at night and handed over in five weeks.
- Area:
- 14 m²
- Duration:
- 5 weeks on site (night works)

Oud and perfume boutique fit-out in Dubai Hills
An illustrative perfume boutique fit-out in a Dubai Hills retail center: a 62 m² shop with a majlis-style testing lounge, locked display joinery, fragrance-safe ventilation and bakhoor zone, built with out-of-hours works in seven weeks.
- Area:
- 62 m²
- Duration:
- 7 weeks

Classroom and science lab refresh at a private school in Muwaileh, Sharjah
An illustrative school classroom refurbishment in Muwaileh, Sharjah: 18 classrooms, two science labs and a learning commons refreshed in the summer break, with acoustic ceilings, better lighting, durable flooring and flexible furniture.
- Area:
- Approx. 1,450 m² (18 classrooms, 2 labs, learning commons)
- Duration:
- 8 weeks (summer break)

Community annual maintenance program for 180 townhouses in Town Square
An illustrative community annual maintenance contract (AMC) in Town Square, Dubai: planned preventive maintenance and reactive repairs for 180 townhouses and shared amenities, with seasonal AC programs, response times by priority and a resident portal.
- Area:
- 180 townhouses plus shared amenities
- Duration:
- 12-month contract

Mezzanine warehouse office fit-out in Jebel Ali Free Zone
An illustrative warehouse office fit-out in Jebel Ali Free Zone: a 310 m² steel mezzanine office with meeting rooms, a dispatch counter and staff welfare areas built above a live distribution floor in nine weeks, with insulated walls and dedicated cooling.
- Area:
- 310 m² mezzanine office plus ground-floor dispatch area
- Duration:
- 9 weeks

Lighting showroom relaunch on Sheikh Zayed Road
An illustrative showroom refurbishment on Sheikh Zayed Road, Dubai: a 540 m² double-height lighting showroom relaunched in eight weeks with dark-ceiling display zones, room-set galleries, a project consultation area and a new glazed frontage.
- Area:
- 540 m²
- Duration:
- 8 weeks