Mezzanine warehouse office fit-out in Jebel Ali Free Zone
An illustrative warehouse office fit-out in Jebel Ali Free Zone: a 310 m² steel mezzanine office with meeting rooms, a dispatch counter and staff welfare areas built above a live distribution floor in nine weeks, with insulated walls and dedicated cooling.
Quick answer
An illustrative warehouse office fit-out in Jebel Ali Free Zone: a 310 m² steel mezzanine office with meeting rooms, a dispatch counter and staff welfare areas built above a live distribution floor in nine weeks, with insulated walls and dedicated cooling.
Key facts
- This warehouse office fit-out in Jebel Ali Free Zone created a 310 m² office on a new steel mezzanine above a working distribution floor.
Last updated:
This warehouse office fit-out in Jebel Ali Free Zone created a 310 m² office on a new steel mezzanine above a working distribution floor. FIXORA Decor designed and built the mezzanine, insulated office enclosure, meeting rooms, a ground-floor dispatch counter, staff washrooms and a pantry in nine weeks, while forklifts and pickers kept working below. This case study is an illustrative example of a typical project of this type; the client is not named.
The brief: a warehouse office fit-out above a working floor
The client, a regional distributor of spare parts, had moved into a larger warehouse unit in Jebel Ali Free Zone. The unit came with a small portacabin-style office at the loading bay, too small for the sales, customer service and accounts teams who were still working from an older site in Al Quoz. The company wanted to bring everyone under one roof without losing racking space, so the only option was to build up.
The brief asked for open-plan desks for about 24 staff, a manager's office, two meeting rooms, a training room that could double as a prayer room, a pantry, male and female washrooms, and a window into the warehouse so supervisors could see the floor. At ground level, a dispatch counter was needed where drivers could collect paperwork without walking into the picking area. Throughout the works, the warehouse had to keep shipping orders every day.
Challenges
- Working above a live floor. Forklifts, pickers and trucks moved below the work area all day, so the mezzanine had to be erected safely with exclusion zones and careful timing.
- Heat. Warehouse roofs in Jebel Ali get extremely hot in summer, and the air under the roof is far hotter than at floor level. An office near the roof needs strong insulation and dedicated cooling, or it becomes unusable.
- Structure and floor loads. The mezzanine columns needed foundations or base plates suitable for the existing slab, which had to be checked by a structural engineer.
- Fire safety. Adding an occupied floor inside a warehouse affects escape routes, detection and sprinklers, so the design needed fire engineering input.
- Dust and noise. Office staff need a quiet, clean environment above an operation that is neither.
Approvals (in general terms)
In a free zone such as Jebel Ali, building works inside a leased unit normally need landlord consent and approval through the free zone's own building and engineering authority, which also handles fire and life-safety review for many free zone projects, with inspections before occupancy. A mezzanine is a structural addition, so the submission included structural calculations, steel details, fire escape routes, detection and sprinkler coverage, and electrical load changes. FIXORA Decor prepared the drawings with a structural engineer and fire consultant, and submitted them on the client's behalf. Because requirements and fees can change, we recommend checking the current process with the free zone authority and the landlord before fixing a move-in date.
Design approach
We positioned the mezzanine along the front wall of the unit, above the loading bay office and an area that only held slow-moving stock, so no high-bay racking was lost. The steel structure is a free-standing frame with its own columns on base plates, designed so loads from the mezzanine do not transfer to the warehouse walls.
The office enclosure on top is built as a box within a box: insulated sandwich panels for the outer walls and ceiling, then a gypsum lining inside with mineral wool for acoustic separation. A dedicated ducted split AC system serves the office, with outdoor units placed on a platform outside the building where they can reject heat effectively. Fresh air comes through a small filtered fresh-air unit to keep dust out.
Inside, the layout puts the open-plan desks along the windows facing the warehouse, with acoustic double glazing so supervisors can see the floor without hearing it. Meeting rooms and the manager's office sit at the ends, and the pantry and washrooms are grouped together over a single drainage route to keep plumbing simple. The training room has a folding partition, a carpeted area that can be used for prayer and a direction marker for qibla on the ceiling.
At ground level, the dispatch counter has a separate entrance from the yard, a transaction window and a small waiting bench for drivers, keeping visitors out of the picking area.
Scope of work
- Structural survey of the slab and design of the steel mezzanine with base plates and bracing
- Fabrication and erection of the mezzanine, steel staircase with handrails and a second escape stair
- Composite floor deck with acoustic underlay and raised access floor in the open-plan area
- Insulated sandwich panel enclosure, gypsum lining, acoustic double-glazed windows
- Ducted split AC, fresh-air unit, extract for washrooms and pantry
- Electrical distribution, LED lighting, small power, data cabling and access control
- Fire detection, alarm, sprinkler modifications below and above the mezzanine, exit signage and emergency lighting
- Washrooms, pantry, plumbing and drainage with a pumped connection to the existing sewer
- Dispatch counter, ground-floor waiting area and yard entrance
- Office furniture and finishes
Materials
| Element | Material | Reason |
|---|---|---|
| Mezzanine frame | Structural steel, hot-dip galvanised base plates | Strong, fast to erect, corrosion-protected |
| Floor deck | Composite steel deck with concrete topping | Rigid, reduces footfall noise and vibration |
| Office enclosure | Insulated sandwich panels with mineral wool core | Keeps roof heat out, non-combustible core |
| Internal walls | Gypsum board on metal studs with acoustic insulation | Quiet meeting rooms |
| Windows to warehouse | Acoustic double glazing | Views of the floor without noise |
| Office floor | Raised access floor with carpet tiles | Flexible cabling, quieter underfoot |
| Washrooms | Porcelain tiles over waterproofing | Durable and easy to clean |
Program: nine weeks with the warehouse running
Steel fabrication started in the workshop as soon as the structural design was approved, while the site was prepared. Work on site was split into phases planned around the warehouse's busiest shipping times:
- Weeks 1–2: clearing the area, relocating slow-moving stock, slab checks and base plate installation. Exclusion zones were set up with barriers and banksmen.
- Weeks 3–4: steel erection and floor deck, carried out mainly on night shifts and Fridays when forklift traffic was lowest.
- Weeks 5–6: panel enclosure, staircases, MEP first fix, sprinkler modifications.
- Week 7: internal partitions, ceilings, washrooms, pantry, AC installation.
- Week 8: flooring, glazing, lighting, data, dispatch counter.
- Week 9: testing, commissioning, authority inspections, furniture and handover.
Debris was removed daily, and dust screens hung from the mezzanine edge during finishing works to protect stock below.
Handover
The client received as-built drawings, structural calculations and steel certificates, fire and life-safety test records, AC commissioning data, electrical test certificates, warranties and an operations manual. We included a load sign for the mezzanine floor, a maintenance plan for AC filters, which clog faster in a warehouse environment, and inspection guidance for the steel structure and handrails. A 12-month defects period applies, with an AC and filter check planned before the first summer.
Working safely around forklifts and trucks
Safety was the main priority throughout. Before starting, we agreed a traffic management plan with the warehouse manager covering pedestrian routes, exclusion zones, banksman positions and delivery times for steel and panels. Lifting operations used a mobile elevating work platform and a small crane for the main beams, always with the area below fully closed. Our team attended the client's site induction, wore high-visibility clothing and followed the warehouse speed and route rules. A daily toolbox talk covered the day's high-risk tasks, and permits to work were issued for hot works near stock. No lost-time incidents occurred during the project.
Results
- All office teams moved into the warehouse within nine weeks, with no racking positions lost.
- The warehouse kept shipping every day during the works.
- Office temperature stays comfortable in summer thanks to the insulated enclosure and dedicated cooling.
- Supervisors can see the entire floor from the office windows; drivers collect paperwork at the dispatch counter without entering the picking area.
- The client closed its older Al Quoz office and reduced overall rent and travel time between sites.
Lessons learned
Insulation decides whether a warehouse mezzanine office works. Panels and a dedicated AC system with external condensers cost more than a basic partition box but avoid an office that nobody wants to sit in during August. Second, steel erection in a live warehouse depends on good timing: night shifts and Fridays made the difference. Finally, involve the fire consultant early, because an added floor inside a sprinklered warehouse affects detection, sprinklers and escape routes more than most clients expect.
Key takeaways
- Build up with a mezzanine to add offices without losing racking.
- Insulate the office enclosure and use dedicated cooling against roof heat.
- Plan steel erection around warehouse traffic with clear exclusion zones.
- Get structural and fire engineering approved by the free zone before fabrication.
Need a warehouse office or mezzanine in Dubai?
Indicative 2026 budgets for a fitted mezzanine office of this kind typically range from around AED 1,800 to AED 3,200 per m² plus 5% VAT, depending on structure, cooling and finishes; we confirm costs after a site survey. Talk to FIXORA Decor on WhatsApp +971501962136 or call +971 50 196 2136, or request a quote at /quote.