In this article
Quick answer
Consent, approvals, who pays, reinstatement at the end of the lease and how to avoid disputes. In Dubai, a tenant can renovate a rented property only with the landlord's written consent, and any work that needs a developer NOC or an authority permit must be applied for in the owner's name or with the owner's authorisation.
Last updated:
In Dubai, a tenant can renovate a rented property only with the landlord's written consent, and any work that needs a developer NOC or an authority permit must be applied for in the owner's name or with the owner's authorization. The landlord, in turn, cannot carry out major works that disturb the tenant's use of the property without agreement, except for necessary repairs and maintenance. The tenancy contract and its addendum should state what can be changed, who pays and whether the tenant must reinstate at the end. Tenancy rules are set by law and interpreted by the Rental Dispute Settlement Centre, so for specific situations check with the Dubai Land Department or a legal adviser.
The basic principle: the owner controls the property
A tenancy gives you the right to use and enjoy the property for the agreed period, not the right to change it. The building, the fixtures and the systems belong to the owner, and the owner is also the person the developer, the building management and the authorities deal with. That is why almost every renovation by a tenant starts with the same document: a clear written consent from the landlord.
Equally, once a property is leased, the landlord cannot simply decide to renovate around the tenant. Dubai's tenancy framework expects landlords to maintain the property and carry out necessary repairs, but major renovation that would disturb the tenant generally needs agreement, and in some situations is a recognized reason for ending a tenancy with proper notice and evidence. If you are a landlord planning a major refurbishment, take advice on the correct notice process before you plan dates.
What tenants commonly want to change
| Change | Landlord consent? | Other approvals? | End-of-lease risk |
|---|---|---|---|
| Painting walls a new color | Advisable in writing | Building work permit | Repaint to original color |
| Curtains, blinds, wall-mounted TV | Advisable | Usually none | Fill and paint drill holes |
| Replacing light fittings | Yes | Building permit for contractor | Restore originals |
| Built-in wardrobes or study joinery | Yes | Building work permit | Removal unless landlord keeps them |
| Kitchen or bathroom upgrade | Yes, essential | Possibly developer NOC | Agree in advance if it stays |
| Removing a wall, opening the kitchen | Yes, essential | Developer NOC and often a permit | Reinstatement can be expensive |
| Pergola, garden, artificial grass (villa) | Yes | Community NOC for structures | Removal or handover terms |
| Smart locks, cameras, Wi-Fi mesh | Yes for fixed devices | Building rules on doors and cameras | Restore original locks |
How to get landlord consent the right way
- Describe the work precisely. List each change, the materials and the contractor. Include photos or simple drawings.
- Agree who pays. Usually the tenant, but some landlords contribute when the work adds lasting value, such as a new kitchen.
- Agree what happens at the end of the lease. Will the improvements stay, be removed, or be removed at the landlord's option? Put it in writing.
- Agree access and timing. Who manages the contractor, and how long the work takes.
- Sign an addendum to the tenancy contract or a separate letter signed by both parties, and keep it with the Ejari documents.
- Get the owner's documents for approvals. Developer NOCs and permits generally need the title deed and owner's ID or a signed authorization.
A friendly WhatsApp message saying go ahead is better than nothing, but it rarely captures the detail you will need if there is a disagreement two years later. A short signed letter is worth the effort.
Approvals still apply to rented homes
Landlord consent is necessary but not sufficient. The building or community has its own rules, and the authorities have theirs:
- Building management work permits for any contractor working inside an apartment tower, with fixed working hours and lift bookings.
- Developer or community NOCs in master communities such as Emaar, Nakheel, Dubai Properties or DAMAC developments, for works beyond cosmetic changes.
- Dubai Municipality or the relevant authority for structural changes, extensions and major MEP works.
- DEWA for electrical load increases.
Our guide to Ejari, tenancy and renovation goes into more detail about the documents tenants usually need.
Who pays for what during the tenancy
Renovation and repair are different. Repairs that keep the property in its agreed condition are generally the landlord's responsibility unless the contract says otherwise or the tenant caused the damage. Improvements that the tenant chooses are generally paid for by the tenant. The gray area is between the two: for example, an old, inefficient AC unit that keeps failing, or a kitchen that is worn out. In those cases, it is often worth proposing a shared approach, where the landlord pays for the replacement and the tenant pays for an upgrade on top.
- Landlord typically pays: structural repairs, major MEP failures, replacement of worn-out fixtures at end of life, waterproofing defects.
- Tenant typically pays: minor maintenance as defined in the contract, damage caused by the tenant, and any improvements requested by the tenant.
- To negotiate: upgrades that add value to the property, such as a new kitchen, built-in wardrobes or energy-saving improvements.
For more on routine responsibilities, read landlord vs tenant maintenance responsibilities.
Reinstatement at the end of the lease
The most common renovation dispute happens at move-out. The landlord expects the property back in the condition it was let in, allowing for normal wear and tear, while the tenant expected that their improvements would be welcome. Avoid this with three steps:
- Record the move-in condition with dated photos and a signed inspection report.
- Record every agreed change in writing, with a clear statement on reinstatement.
- Inspect together before move-out and agree what must be restored.
Indicative 2026 reinstatement costs, excluding 5% VAT, give an idea of what is at stake:
| Reinstatement item | Indicative range (AED) |
|---|---|
| Repaint a 2-bed apartment to original white | 2,500 to 5,000 |
| Remove wallpaper and repaint one feature wall | 600 to 1,500 |
| Fill and paint TV and shelf fixings | 300 to 900 |
| Remove built-in study joinery and make good | 1,500 to 4,000 |
| Rebuild a removed partition wall with finishes | 4,000 to 12,000 |
| Remove a garden pergola and restore landscaping | 3,000 to 10,000 |
Our article on move-out maintenance and repainting covers deposit protection in more detail.
When the landlord wants to renovate
Landlords sometimes want to renovate a tenanted property, either to fix problems or to increase the rent at renewal. Practical points:
- Repairs can be arranged with reasonable notice and access times agreed with the tenant.
- Upgrades during the tenancy should be agreed with the tenant, including timing and any temporary inconvenience. Offering a rent concession or covering hotel costs for disruptive work can make agreement easy.
- Major renovation requiring vacant possession follows specific legal notice requirements and usually needs evidence such as approved permits. Take advice from the Dubai Land Department channels or a legal adviser before serving notice.
- Between tenancies is the simplest time to renovate. Plan works so the property is ready for the next listing.
Commercial tenancies: a different emphasis
Offices, shops and warehouses are different. Commercial tenants are expected to fit out their units, and leases normally include a fit-out guide, a landlord approval process, a fit-out deposit and clear reinstatement obligations. The principles are the same, consent, approvals and end-of-lease terms, but the documents are more formal. Before signing a commercial lease, check the rent-free fit-out period, whether the landlord contributes to the fit-out, which items of the existing installation you may reuse, and the exact reinstatement standard at the end. See our article on office reinstatement and dilapidation works.
Smart ways for tenants to personalize without renovating
If your landlord says no, or you simply do not want reinstatement risk, there is a lot you can do without touching the structure or the fixed installation. These changes are fully reversible and usually need no approvals beyond basic contractor access:
- Free-standing storage: wardrobes, shelving units and room dividers that leave with you.
- Removable wallpaper and decals: peel-and-stick products designed for rentals, though test a small patch first, as Dubai's humidity can affect adhesion and paint underneath.
- Rugs over tiles: warmer underfoot and good for acoustics in apartment towers.
- Plug-in and battery lighting: floor lamps, table lamps and rechargeable wall lights that create layered lighting without rewiring.
- Curtains on tension rods or existing tracks: block the afternoon sun without new fixings.
- Smart plugs and bulbs: home automation that needs no wiring changes.
- Balcony upgrades: outdoor rugs, planters and furniture, within the building's rules on screens and safety.
For landlords, the same list is useful in reverse: a neutral, well-maintained base with good lighting and storage is what most tenants want, and it reduces the pressure to make changes during the tenancy.
Resolving disagreements
If landlord and tenant cannot agree, start with a calm written summary of the issue and the documents: contract, addendum, photos and invoices. Many disputes settle at this stage. If not, Dubai has a dedicated system for rental disputes through the Rental Dispute Settlement Centre. Procedures and filing fees change, so check the current process before deciding to file.
Key takeaways
- Tenants need the landlord's written consent before renovating, and approvals are usually applied for with the owner's documents.
- Building, community and authority rules apply to rented homes exactly as to owner-occupied ones.
- Agree in writing who pays and what happens to improvements at the end of the lease.
- Landlords should agree upgrades with sitting tenants and take advice before seeking vacant possession for renovation.
- Keep photos, signed addenda and invoices; they resolve most disputes.
Renovating a rented home?
FIXORA Decor works with both tenants and landlords on rented properties across Dubai, from quick refreshes to full refurbishments between tenancies, and can help prepare the scope for landlord approval. Message us on WhatsApp +971501962136 or request a quotation.
The information in this article is general guidance, not advice for your specific project. See our Terms.
Frequently asked questions
Sources
Was this article helpful?
Get new articles by email
Practical tips now and then. Confirm by email, unsubscribe any time.



