
Landlord maintenance program for 60 apartments in International City
Landlord maintenance program for 60 apartments in International City: reactive repairs by fault severity, turnover refurbishment between Ejari leases, photo condition records, pre-summer AC servicing and monthly reporting.
Quick answer
Landlord maintenance programme for 60 apartments in International City: reactive repairs by fault severity, turnover refurbishment between Ejari leases, photo condition records, pre-summer AC servicing and monthly reporting. This landlord maintenance programme covers 60 leased apartments across several buildings in International City, Dubai.
Key facts
- For orientation, these are typical / indicative 2026 ranges used elsewhere on our site, which depend on scope and are confirmed after a site survey, excluding 5% VAT:
Last updated:
This landlord maintenance program covers 60 leased apartments across several buildings in International City, Dubai. FIXORA Decor manages reactive repairs during tenancies and turnover refurbishment between Ejari-registered leases, backed by condition inspections, preventive AC servicing and one consolidated monthly report for the landlord.
The sections below describe how the program is set up and why it works, then give practical advice for any landlord with a multi-unit portfolio in Dubai who wants faster turnarounds, fewer disputes and less time spent chasing contractors.
Program at a glance
| Item | Detail |
|---|---|
| Location | International City, Dubai |
| Portfolio | 60 apartments across several buildings |
| Client | Landlord |
| Duration | Ongoing program |
| Services | Reactive repairs, turnover refurbishment, condition inspections, preventive AC servicing, monthly reporting |
The brief
A landlord with 60 apartments across several buildings in International City needed a single maintenance program to manage reactive repairs during tenancies and turnover refurbishment between Ejari-registered leases.
Without a single program, landlords with many units often end up using different handymen for different jobs, with no consistent standard, no shared records and no clear view of what each unit costs to maintain. The aim here was one point of contact, one standard and one set of records for the whole portfolio.
Scope of work
- Reactive repair call-outs for plumbing, electrical and AC faults during occupied tenancies, with response times agreed by fault severity
- Turnover refurbishment between tenancies: repainting, deep cleaning, appliance checks and minor repairs ahead of the next tenancy start date
- Pre-handover condition inspections and photographic records to support tenancy documentation
- Preventive AC servicing across all units ahead of the summer cooling season
- Consolidated monthly reporting across all 60 units for the landlord's records
Challenges and how they were handled
Short windows between tenancies
Turnover refurbishment windows between a tenant moving out and the next tenancy starting were often short, so FIXORA Decor built a standard turnover checklist and pre-ordered common replacement items to compress the refurbishment timeline without compromising quality.
Different rules in each building
Managing 60 units across several buildings also meant coordinating different building management access rules, which the team tracked per building to avoid delays. International City is made up of low-rise buildings grouped into themed clusters, and access procedures, permitted working hours and parking or delivery arrangements can differ from one building to the next.
How the program is structured
1. Reactive repairs by severity
Not every fault is equally urgent. A severity-based approach means the most serious problems are handled first, and the landlord and contractor agree in advance what counts as what. A typical way to categorize faults is:
| Severity | Typical examples | Priority |
|---|---|---|
| Emergency | Active water leak, total power loss, AC failure in peak summer, safety risk | Attended first |
| Urgent | Blocked drain, partial electrical fault, water heater not working | Attended soon after emergencies |
| Routine | Dripping tap, loose fitting, door adjustment, minor cosmetic repairs | Scheduled, often grouped by building |
The response times for each category are agreed between landlord and contractor when the program is set up, and recorded so both sides know what to expect.
2. A standard turnover checklist
Using the same checklist for every unit means nothing is forgotten and every tenant moves into a unit prepared to the same standard. A typical turnover checklist includes:
- Walls and ceilings repainted or touched up in the standard color
- Bathroom and kitchen sealants checked and renewed where needed
- Taps, mixers, drains and toilet cisterns tested for leaks
- Sockets, switches and light fittings tested, with failed lamps replaced
- Appliances checked and their condition recorded
- AC filters cleaned and cooling checked
- Doors, locks, hinges and wardrobe fittings adjusted
- Deep clean, including kitchen, bathroom, windows and balcony
- Final condition inspection with photographs
3. Stocked common parts
Pre-ordering common replacement items is a simple but effective way to save time. In a portfolio of similar units, the same items fail repeatedly: tap cartridges, shower hoses, toilet fill valves, light fittings, hinges and handles. Holding stock of these avoids a second visit while parts are sourced.
4. Condition inspections and photo records
Pre-handover inspections with photographs give the landlord clear evidence of a unit's condition at the start of each tenancy. At the end of the tenancy, the same records make it easier to agree what is normal wear and tear and what is damage. Our guides on landlord and tenant maintenance responsibilities and move-out maintenance and security deposits explain how these records are typically used.
5. Preventive AC servicing before summer
AC faults are the most disruptive complaint a Dubai tenant can raise in summer. Servicing every unit before the cooling season, including filter cleaning, coil checks and drain line clearing, reduces breakdowns and water leaks from blocked condensate lines when demand is highest. See what an AC service includes.
6. One monthly report
Consolidated monthly reporting across all 60 units gives the landlord one place to see call-outs, turnovers, costs and outstanding items, unit by unit. Over time, this shows which units or buildings need more attention and helps with budgeting.
Indicative costs for common program items
Multi-unit programs are priced on the portfolio, the service levels and the mix of planned and reactive work, so every program is quoted individually. For orientation, these are typical / indicative 2026 ranges used elsewhere on our site, which depend on scope and are confirmed after a site survey, excluding 5% VAT:
| Item | Indicative range |
|---|---|
| Basic split AC unit service | AED 100–200 per unit |
| Split AC unit deep clean | AED 200–400 per unit |
| Repaint of a studio in a standard white or off-white | AED 800–1,500 |
| Repaint of a one-bedroom apartment | AED 1,200–2,200 |
| Repaint of a two-bedroom apartment | AED 1,800–3,200 |
Our articles on whether an annual maintenance contract is worth it and apartment painting costs give more detail.
What to agree before a program starts
A maintenance program for many units works best when the ground rules are written down at the start. Landlords setting up a similar arrangement should agree:
- Who tenants contact. One channel for reporting faults, whether through the landlord, a property manager or directly to the contractor, avoids lost requests and duplicate visits.
- An approval limit. A value below which the contractor can complete a repair without waiting for sign-off. This keeps small jobs moving while larger costs still come to the landlord.
- What is included and what is extra. For example, whether parts are charged separately, how major replacements such as a water heater or AC unit are handled, and how call-outs outside normal hours are priced.
- Turnover standards. The color, finish and fittings used in every unit, so each refurbishment matches the last and touch-ups blend in.
- Reporting format. What the monthly report shows, such as unit, date, fault, action, cost and status, so the landlord can compare months and units.
- Access arrangements. How keys are held, how tenants are notified before visits, and how each building's management is informed.
Getting these points clear early prevents most of the friction that arises later, both with tenants and with building management.
Climate and wear in Dubai rental units
Dubai's climate shapes what fails in rented apartments. Long periods of AC use mean filters and condensate drains clog, and blocked drains often show up as water dripping from indoor units. Humidity around bathrooms and kitchens breaks down sealants and encourages mold on grout, while sun through west-facing windows fades paint and curtains. Planning turnover work and preventive visits around these patterns, rather than waiting for complaints, keeps units in better condition for longer.
Is a portfolio program right for you?
A single program usually makes sense when a landlord has several units, especially in the same area, and wants consistency and less day-to-day involvement. It suits owners who live abroad, investors with growing portfolios and landlords who have had disputes over unit condition. A landlord with one or two units may be better served by ad-hoc call-outs plus a planned turnover refresh, as in our JVC apartment makeover for re-letting.
Planning checklist for multi-unit landlords
- List every unit with its building, size, appliances and AC type.
- Agree fault categories and response expectations in writing.
- Adopt one standard color, sealant and set of fittings across the portfolio.
- Collect each building's management rules, access process and working hours.
- Schedule AC servicing for all units before the summer peak.
- Insist on photographic condition records at every handover.
- Review the monthly report and adjust the plan for units that keep generating call-outs.
For a community-scale example, see our annual maintenance contract for a 40-villa community.
Result
The landlord has maintained consistently quick turnaround between tenancies under the program, with condition records supporting smoother handovers and fewer disputes at tenancy end.
Key takeaways
- One program, one standard and one report make a large portfolio manageable.
- Severity-based response keeps urgent faults moving without over-paying for routine jobs.
- A standard turnover checklist and stocked parts shorten vacancy periods.
- Photo records at handover reduce disputes at the end of a tenancy.
- Pre-summer AC servicing prevents the most disruptive tenant complaints.
Frequently asked questions
Who pays for maintenance in a rented apartment in Dubai?
Generally the landlord covers major repairs and the tenant covers minor upkeep, but the tenancy contract sets the details. Clear condition records help resolve any disagreement.
How often should AC units in rental apartments be serviced?
At least once a year before the summer cooling season is a sensible baseline, with filters cleaned more often. This program includes preventive servicing across all units ahead of summer.
How can landlords reduce the vacant period between tenants?
Use a standard turnover checklist, keep common spare parts in stock, book building access early and inspect the unit as soon as the tenant leaves.
Do condition photos really help with deposit disputes?
Yes. Dated photos taken at handover give both landlord and tenant a clear reference point when the unit is checked at the end of the tenancy.
Can one contractor cover units in different buildings?
Yes, provided each building's access rules and working hours are tracked. On this program the team kept those rules per building to avoid delays.
Set up a maintenance program for your units
Whether you own a handful of apartments or a large portfolio, FIXORA Decor can design a program around your units, tenancy cycles and budget. Call +971 50 196 2136, send a WhatsApp to +971501962136, or request a quote. Learn more about our home and office maintenance and painting services.
Gallery
Frequently asked questions
A single programme usually makes sense when a landlord has several units, especially in the same area, and wants consistency and less day-to-day involvement. It suits owners who live abroad, investors with growing portfolios and landlords who have had disputes over unit condition. A landlord with one or two units may be better served by ad-hoc call-outs plus a planned turnover refresh, as in our JVC apartment makeover for re-letting .
Generally the landlord covers major repairs and the tenant covers minor upkeep, but the tenancy contract sets the details. Clear condition records help resolve any disagreement.
At least once a year before the summer cooling season is a sensible baseline, with filters cleaned more often. This programme includes preventive servicing across all units ahead of summer.
Use a standard turnover checklist, keep common spare parts in stock, book building access early and inspect the unit as soon as the tenant leaves.
Yes. Dated photos taken at handover give both landlord and tenant a clear reference point when the unit is checked at the end of the tenancy.


