In this article
Quick answer
Typical prices for repainting a Dubai apartment, from a studio to a three-bedroom, with per room and per square metre rates and the factors that push a quotation up or down. These are typical ranges for walls and ceilings in occupied or empty units with normal wear.
Key facts
- Typically adds 10–25% to the job.
- Often priced separately at AED 15–35 per m².
- Typically adds 20–40% to the material cost.
- Expect occupied jobs to cost around 15–30% more and to take an extra day or two.
- VAT surprises: confirm whether the price includes 5% VAT.
Last updated:
Repainting a typical Dubai apartment in a standard white or off-white emulsion usually costs between AED 800 and AED 1,500 for a studio, AED 1,200–2,200 for a one-bedroom, AED 1,800–3,200 for a two-bedroom and AED 2,800–4,500 for a three-bedroom, exclusive of 5% VAT. These are typical ranges for walls and ceilings in occupied or empty units with normal wear. Color changes, damaged surfaces, premium paint grades and tight move-out deadlines are what move a quotation outside these bands.
Below we break the price down by room and by square meter, explain what proper preparation involves, and show you how to read a painting quotation so you can compare like with like.
Typical apartment painting prices in Dubai
Most painting contractors in Dubai price apartments either as a lump sum per unit or per room. Behind both methods sits a calculation based on wall and ceiling area, the number of coats, the paint grade and the time needed to protect floors and furniture. The table below gives typical ranges for a two-coat repaint over sound, previously painted surfaces.
| Unit or item | Typical range (AED, excl. VAT) | Notes |
|---|---|---|
| Studio (walls and ceilings) | 800–1,500 | Includes kitchen and bathroom ceiling if accessible |
| 1-bedroom apartment | 1,200–2,200 | Living, bedroom, corridor, kitchen |
| 2-bedroom apartment | 1,800–3,200 | Add 15–25% for maid's room and storage |
| 3-bedroom apartment | 2,800–4,500 | Larger towers in Downtown or Dubai Marina sit at the top |
| Single room (walls only) | 250–600 | Depends on size and ceiling height |
| Walls per m² (two coats) | 8–18 | Standard emulsion, labor and material |
| Ceilings per m² | 6–14 | Higher for double-height or bulkhead ceilings |
| Doors and frames (each side) | 80–200 | Enamel or water-based satin |
| Feature wall in a deep color | 250–700 | Extra coats and a tinted base |
Treat these figures as a guide rather than a fixed price list. A site visit is the only reliable way to confirm quantities, the true condition of the walls and access arrangements in your building.
What drives the price up or down
Surface condition and preparation
Preparation is usually the largest variable. A wall with a few nail holes needs filling and spot sanding; a wall with hairline cracks, flaking paint around the AC grilles or damp staining near a bathroom needs scraping, crack repair with flexible filler, a stain-blocking primer and sometimes a skim coat. In Dubai, the combination of strong air conditioning and outdoor humidity often causes condensation marks around windows and AC ducts, which must be treated before repainting or they reappear within months.
- Light preparation: filling nail holes, light sanding, dusting. Usually included in the base price.
- Medium preparation: crack repair, stain blocking, patch priming. Typically adds 10–25% to the job.
- Heavy preparation: skim coating, removing old wallpaper, treating mold. Often priced separately at AED 15–35 per m².
Color changes
Going from white to white is the cheapest job. Covering a dark accent color or moving from a strong color to a light neutral usually needs a primer plus two finish coats, which adds material and a day of labor. Deep colors such as navy, forest green or charcoal often need three coats over a tinted base to achieve even coverage.
Paint grade
The paint you choose affects both the price and how the walls hold up. Contractors usually offer three broad grades:
- Economy emulsion: suitable for quick handovers and rental refreshes. Lower washability and coverage.
- Mid-grade washable emulsion: the sensible default for occupied homes, with matte or low-sheen finishes that tolerate wiping.
- Premium low-VOC or scrubbable emulsion: better opacity, lower odor and stronger stain resistance. Useful for children's rooms, corridors and homes with pets. Typically adds 20–40% to the material cost.
Ask for the product type, sheen level and number of coats in writing. Two coats of a mid-grade paint will usually look and wear better than one coat of a premium product.
Ceiling height and access
Standard Dubai apartment ceilings are around 2.7–3.0 meters. Double-height living rooms in some Palm Jumeirah, Downtown and JBR units require tower scaffolds, which add both cost and time. Gypsum bulkheads and cove lighting details also take longer to cut in neatly.
Occupied versus empty units
Painting an empty unit is faster because there is no furniture to move and cover. In an occupied home, the crew has to shift furniture, protect it, and work room by room. Expect occupied jobs to cost around 15–30% more and to take an extra day or two.
Building rules and timing
Most Dubai towers require a work permit from building management before contractors can enter, with work typically limited to set hours on weekdays. Some buildings ask for a refundable deposit or proof of the contractor's trade license and insurance. These rules rarely add a direct fee, but restricted hours can stretch a two-day job into three, which a contractor will price in.
Move-out painting and tenancy handover
Many tenancy contracts in Dubai require the tenant to return the unit in its original color and condition, and landlords often deduct painting costs from the security deposit if this is not done. A move-out repaint is usually a white-to-white job with minor patching, so it sits at the lower end of the ranges above. If you are a tenant, check your tenancy contract before booking, take photos of the walls before and after, and ask the contractor for a tax invoice you can show to the landlord or agent.
Landlords preparing a unit for a new tenant often combine painting with small repairs such as resealing the bathroom, replacing damaged skirting or servicing the AC. Bundling these into one visit usually works out cheaper than separate call-outs.
How long apartment painting takes
- Studio or one-bedroom: one to two days.
- Two-bedroom: two to three days.
- Three-bedroom: three to four days.
- Add a day for color changes, heavy preparation or occupied units.
Water-based emulsions are touch dry quickly in air-conditioned rooms, but keep the AC running and the windows mostly closed during drying to avoid dust settling on the fresh finish.
What to watch out for
- Vague quotations: a one-line price with no mention of coats, paint grade or preparation makes comparison impossible. Our guide on how to compare three renovation quotations explains what a clear scope should include.
- Single-coat jobs: a very low price often means one coat. It may look acceptable on day one but will show patchiness under evening lighting.
- Skipped protection: floors, sockets, switches and AC grilles should be masked. Paint on marble or wooden floors is costly to remove.
- Ignoring damp: painting over a leak stain without finding the cause only hides the problem for a few weeks.
- VAT surprises: confirm whether the price includes 5% VAT. If the contractor is VAT registered, you should receive a proper tax invoice showing their TRN. See how VAT applies to fit-out and maintenance invoices for what that invoice should show.
Getting an accurate quotation
To get a reliable price quickly, share the unit type, approximate size, number of rooms, whether it is occupied, the colors you want and a few photos of any damaged areas. FIXORA Decor usually confirms quantities on a short site visit and then issues a written quotation listing preparation, paint type, number of coats and the expected duration. If you are also thinking about new flooring, wallpaper or a feature wall, mention it at the start so the work can be sequenced in the right order: painting generally comes after ceiling and joinery work but before final floor protection is removed.
For larger homes or villas, FIXORA Decor can also quote external painting, but external work in summer follows the midday outdoor work break from 15 June to 15 September, which affects scheduling.
Next step
If you would like a fixed written price for your apartment, request a free quotation with a few photos and your preferred dates, or read more about our painting services to see how we prepare, protect and finish each room before handover.
The information in this article is general guidance, not advice for your specific project. See our Terms.
Frequently asked questions
Was this article helpful?
Get new articles by email
Practical tips now and then. Confirm by email, unsubscribe any time.



