How to Read a BOQ Quotation for Fit-Out Work in the UAE

Understand a fit-out bill of quantities: how a BOQ is structured, what provisional sums and exclusions mean, how VAT is shown and how to compare contractor bids fairly.

Updated 13 Oct 20266 min read
How to Read a BOQ Quotation for Fit-Out Work in the UAE
In this article

Quick answer

Understand a fit-out bill of quantities: how a BOQ is structured, what provisional sums and exclusions mean, how VAT is shown and how to compare contractor bids fairly. A bill of quantities, or BOQ, breaks a fit-out quotation into individual items, each with a description, a unit, a quantity, a rate and a total.

Key facts

  • The key points to check are the scope descriptions, the quantities, any provisional sums and prime cost items, the exclusions list and how 5% VAT is shown.
  • Tiles and flooring are usually ordered with an extra 5–10% for cuts and breakages, and more for complex patterns such as herringbone.
  • If one contractor allows AED 60 per m² for tiles and another AED 120, the first is not cheaper; it simply assumes a cheaper tile.
  • VAT in the UAE is 5% and is charged on construction and fit-out services.
  • On a AED 300,000 project, the difference is AED 15,000.

Last updated:

A bill of quantities, or BOQ, breaks a fit-out quotation into individual items, each with a description, a unit, a quantity, a rate and a total. Reading it well tells you exactly what you are buying, what is missing and where two quotations that look similar are actually different. The key points to check are the scope descriptions, the quantities, any provisional sums and prime cost items, the exclusions list and how 5% VAT is shown. With those understood, comparing bids becomes a matter of lining up like with like.

How a BOQ is structured

Most fit-out BOQs in the UAE are organized into sections that follow the order of work or the building trades:

  1. Preliminaries: site setup, protection, insurance, permits handling, supervision, cleaning and waste removal.
  2. Demolition and strip-out.
  3. Civil and builders' work: blockwork, plastering, screeding, waterproofing.
  4. Partitions and ceilings.
  5. Finishes: flooring, wall tiling, paint, wall coverings.
  6. Joinery and doors: kitchens, wardrobes, vanities, doors and ironmongery.
  7. MEP: electrical, lighting, plumbing, drainage, AC, fire alarm and sprinklers.
  8. Sanitaryware and fixtures.
  9. Provisional sums and allowances.
  10. Summary: section totals, subtotal, VAT and grand total.

Each line should describe the item precisely enough that you could buy it: material, size, thickness, grade and finish. For example, a line reading 'porcelain floor tile 600 x 1200 mm, matte, R10, including adhesive, grout and skirting' is useful. A line reading 'flooring' is not.

Units, quantities and rates

Common units are m² for floors, walls and ceilings, linear meters for skirting, worktops and cornices, numbers for doors, sockets and sanitaryware, and lump sum for items that cannot easily be measured. Check quantities against your floor plan. A quick check of floor area and wall area often reveals overestimates or missing rooms.

Remember that some quantities include a wastage allowance. Tiles and flooring are usually ordered with an extra 5–10% for cuts and breakages, and more for complex patterns such as herringbone. A BOQ that shows exact net areas may be pricing wastage within the rate; one that shows gross quantities may not. Neither is wrong, but the two must be read consistently when you compare contractors.

Rates tell you about the specification. A painting rate of AED 12 per m² and one of AED 30 per m² are not the same job; the second probably includes more coats, better paint, filling and sanding. Ask what the rate includes before choosing the lower one. Our guide to questions to ask a fit-out contractor includes questions that help clarify rates.

Provisional sums, PC sums and allowances

These are the lines that most often cause the final cost to change.

  • Provisional sum: an amount included for work that cannot yet be defined, such as repairs to hidden drainage. It is adjusted to the actual cost once known.
  • Prime cost (PC) sum or allowance: an amount for an item you have not yet chosen, such as tiles at AED 80 per m² or sanitaryware at AED 6,000. If you choose something more expensive, the difference is added, often with an agreed margin.
  • Contingency: a client-held reserve for unforeseen work. It is better kept in your own budget than embedded in a contractor's quotation.

A quotation with many provisional sums looks cheap but carries more price risk. If one contractor allows AED 60 per m² for tiles and another AED 120, the first is not cheaper; it simply assumes a cheaper tile. Normalize allowances before comparing totals.

Measured items versus lump sums

Measured items, with a quantity and a rate, are transparent: if the area changes, the cost changes proportionately and everyone can check the arithmetic. Lump-sum items bundle work into a single figure, which is reasonable for things like site setup or a complete AC rebalancing but makes it hard to value changes. A good BOQ uses lump sums sparingly and explains what each one covers. If a significant part of the price is shown as lump sums, ask for a breakdown before signing.

How variations are valued

The BOQ rates often become the basis for pricing changes. If you add ten square meters of tiling, the agreed tiling rate should apply. Where no comparable rate exists, the contractor should submit a priced variation for your written approval before carrying out the work. Keep a variation register listing each change, its value and its approval date. At the end of the project, the final account brings together the original contract sum, approved variations and adjustments to provisional sums, and should match your own register.

Variations can also reduce the price. If you remove an item or choose a cheaper finish, the omitted work should be credited at the BOQ rate. Make sure omissions are recorded with the same care as additions.

Exclusions and assumptions

The exclusions list is where differences hide. Common exclusions in Dubai fit-out quotations include:

  • Authority, developer and building management fees and deposits.
  • Consultant fees for structural or MEP submissions.
  • DEWA load upgrades and new connections.
  • Furniture, appliances, curtains and blinds.
  • Work outside normal hours, required by some towers and offices.
  • Repairs to hidden defects discovered during work.
  • Fire system modifications by a Civil Defence-approved subcontractor.

None of these is wrong to exclude, but you must know about them to budget properly. Ask each contractor to price the same assumptions or state them explicitly.

VAT and payment terms

VAT in the UAE is 5% and is charged on construction and fit-out services. A clear quotation shows a subtotal exclusive of VAT, the VAT amount, and the total inclusive of VAT, along with the contractor's tax registration number. If VAT is not shown, ask whether the price is inclusive or exclusive. On a AED 300,000 project, the difference is AED 15,000.

Check the payment schedule at the same time. Typical structures are an advance of 20–30% on signing, stage payments linked to measurable milestones, and a final payment at handover, with possible retention of 5–10% held for the defects period.

Comparing bids side by side

The table below shows how to set out a simple comparison. Use the same sections for every contractor and note any differences in scope.

CheckContractor AContractor BWhat to ask
Total exclusive of VATAED 245,000AED 268,000Are both totals based on the same drawings?
Tile allowanceAED 60 per m²AED 110 per m²Normalize to your chosen tile
Provisional sumsAED 35,000AED 8,000Which items are undefined, and why?
Preliminaries and wasteExcludedIncludedAdd the missing cost to A
Program8 weeks11 weeksDoes the shorter one allow for approvals?
Retention and warrantyNone5% for 12 monthsWhich gives you more protection?

In this example, once the tile allowance, provisional sums and waste removal are adjusted, the apparently cheaper quotation may be the more expensive one. The figures are illustrative only. FIXORA Decor provides itemized BOQs so that this kind of comparison is easy to make.

What to watch out for

  • Lump-sum quotations with no breakdown, which make variations impossible to value.
  • Large provisional sums on items that could have been measured.
  • Descriptions with no specification, such as 'supply and install kitchen'.
  • Rates that are very low for skilled items like waterproofing or electrical work.
  • Quotations that are valid for only a few days, putting pressure on your decision.

Next step

If you would like a quotation you can compare line by line, send your drawings or a scope description and FIXORA Decor will prepare a free quotation with an itemized BOQ. Our turnkey fit-out service includes a clear scope, program and payment schedule from the start.

The information in this article is general guidance, not advice for your specific project. See our Terms.

Frequently asked questions

Not necessarily. Differences in specification, allowances, provisional sums and exclusions can make a low quotation more expensive by the end. Normalize allowances and add excluded items before comparing, then consider program, warranty and payment terms.
Yes. You can ask for specification changes, alternative materials, firm prices instead of provisional sums, or clarification of exclusions. A good contractor will revise the BOQ and explain the effect of each change on cost and program.
If the work they cover is not needed or costs less, the unused amount is deducted from the final account. This should be stated in the contract, along with how actual costs will be evidenced and approved.

Sources

Was this article helpful?

Get new articles by email

Practical tips now and then. Confirm by email, unsubscribe any time.

Need help with your project?

Our team is ready to help — get a free quotation today.

Or call us+971 50 196 2136

Serving