Shell and Core vs Category A vs Category B Fit-Out in Dubai

Shell and core, Category A and Category B are the three delivery levels of a Dubai office. Learn what each includes, who usually pays, typical AED ranges per sqft and how to read your lease before you budget.

Updated 13 Oct 20268 min read
Shell and Core vs Category A vs Category B Fit-Out in Dubai
In this article

Quick answer

Shell and core, Category A and Category B are the three delivery levels of a Dubai office. Learn what each includes, who usually pays, typical AED ranges per sqft and how to read your lease before you budget. Knowing which level your unit is handed over at decides your budget, programme and approvals more than any design choice.

Last updated:

In Dubai, shell and core is a bare unit with structure, facade, risers and building services stopping at the floor; Category A fit-out adds the basic, lettable finishes such as raised floors, ceilings, lighting, air-conditioning distribution and fire services; and Category B fit-out is the tenant-specific layer of partitions, meeting rooms, joinery, branding, furniture and IT. Knowing which level your unit is handed over at decides your budget, program and approvals more than any design choice.

This guide explains the shell and core vs Category A vs Category B fit-out question as it applies to offices in Business Bay, DIFC, Dubai Marina, JLT, Downtown, Dubai Silicon Oasis and Abu Dhabi, and what each level means for the money you need to set aside.

Shell and core vs Category A vs Category B fit-out: the short definitions

The terms come from the UK and spread across the Gulf with international landlords and consultants. They are not legal definitions, so every lease and every landlord's fit-out manual describes them slightly differently. Treat the definitions below as the market norm and always confirm the exact handover specification in writing.

Shell and core

A shell and core unit is the building envelope and the shared infrastructure, with nothing inside the demise that is specific to an occupier. Typically you receive:

  • Structural slab and columns, often with exposed services above
  • External facade and glazing, sealed and weather-tight
  • Common areas, lifts, staircases and core toilets finished by the landlord
  • Chilled water or district cooling connection points at the riser, without fan coil units or ductwork inside the unit
  • Main electrical supply terminated at a tenant distribution board or isolator
  • Fire alarm and sprinkler mains in the riser, sometimes with a basic sprinkler grid

Shell and core is common in newer Business Bay and Dubai South buildings, in retail units in malls and in many warehouses converted to offices in Al Quoz. It gives the most freedom, but also the longest program and the highest cost to the tenant.

Category A (Cat A)

Category A turns the shell into a usable, lettable open-plan floor. It typically includes:

  • Suspended ceiling, usually mineral fiber tiles in a grid
  • LED lighting at a general office lux level
  • Fan coil units and supply ductwork with linear or square diffusers
  • Raised access floor or a finished screed, sometimes with carpet tiles
  • Fire alarm detectors, sprinkler heads and emergency lighting laid out for open plan
  • Painted perimeter walls and finished window reveals
  • Small power at the perimeter or floor boxes on a grid

Most Grade A office buildings in DIFC, Downtown and parts of JLT lease space at Cat A. It looks finished in marketing photos, but it is designed for an empty open floor, not for your company.

Category B (Cat B)

Category B is everything that makes the space yours: the layout, partitions, glass meeting rooms, reception desk, pantry, private offices, acoustic treatment, feature ceilings, branding, furniture, AV and IT cabling. It almost always requires modifying the Cat A services, because every new room needs its own air supply, return, lighting control, smoke detection and sprinkler coverage.

What each level costs in Dubai in 2026

The table shows indicative 2026 ranges per square foot of net internal area, exclusive of 5% VAT. They depend heavily on specification, building rules, the condition of existing services and how much you reuse, so treat them as budgeting bands, not quotations.

LevelTypical scopeIndicative range (AED / sqft)Typical on-site duration (5,000 sqft)
Shell and core to Cat ACeiling, lighting, HVAC distribution, floor, fire services120 – 2208 – 12 weeks
Cat A to basic Cat BPartitions, a few rooms, pantry, carpet, standard furniture150 – 2808 – 12 weeks
Cat A to mid-range Cat BGlass rooms, feature ceilings, joinery, acoustic panels, AV280 – 45010 – 14 weeks
Shell and core to premium Cat BFull design, bespoke joinery, high-end finishes and AV450 – 800+14 – 22 weeks

For more detail on office budgets, see our guide to office fit-out cost per square foot in Dubai.

Who pays for what: reading the lease

The handover level is negotiated in the heads of terms, so it is worth understanding before you sign. Points to look for:

  • Handover condition: the lease or the landlord's fit-out guide should list exactly what is installed. "Cat A" in a sales brochure is not enough.
  • Rent-free fit-out period: landlords in Dubai commonly offer a rent-free period to cover the fit-out. Shell and core units usually justify a longer period than Cat A units. Make sure it starts from actual access and approval, not from the signing date.
  • Fit-out contribution: some landlords offer a cash contribution or carry out part of the Cat B work themselves.
  • Reinstatement: many leases require you to return the space to the original handover condition when you leave. If you remove Cat A ceilings to build Cat B, you may have to put them back. Our guide to reinstatement and dilapidation works explains the exit side.
  • Landlord-nominated contractors: some buildings require that work on fire alarm, sprinklers or the building management system is done by the landlord's nominated specialist, at your cost.

Cat A wastage: the hidden cost nobody mentions

One of the most common budgeting mistakes is assuming a Cat A floor saves the full Cat A cost. In reality, a cellular Cat B layout often means:

  • Moving or adding fan coil units and diffusers so each meeting room is cooled and has its own thermostat
  • Relocating sprinkler heads and smoke detectors to suit new room layouts, which requires Civil Defence approval
  • Removing ceiling tiles in areas that will have plasterboard feature ceilings or exposed soffits
  • Replacing generic light fittings with ones that suit the design or lighting controls
  • Lifting carpet tiles laid by the landlord to install new floor boxes or a different finish

On a heavily partitioned layout, 20 to 40 percent of the Cat A installation can be modified or wasted. Some tenants negotiate with the landlord to receive a shell or partial Cat A unit with a matching cash contribution, which can be cheaper and greener than ripping out new materials.

Approvals at each level

The approval route depends on the zone and the building, not on the label. In general terms:

  • Landlord or building management approval of the design, contractor and method statements is needed at every level.
  • Authority approval through Dubai Municipality, or the relevant free zone authority such as DDA, Trakhees, DIFC or DMCC, is typically required for Cat A and Cat B fit-outs, with drawings submitted by a registered consultant or approved contractor.
  • Civil Defence (DCD) approval is needed for fire alarm and fire-fighting changes, which almost every Cat B layout involves.
  • DEWA involvement is needed where the electrical load changes significantly, for example adding a server room or a commercial kitchen.

Fees, documents and timelines change, so check the current requirements with the authority or let your consultant manage the submissions. Our guide to Dubai Municipality permits covers the general process.

How to choose: shell and core, Cat A or Cat B-ready space

Choose shell and core when

  • You need a highly specific layout, such as a clinic, training center, lab or restaurant
  • You plan a long lease, typically five years or more, so the investment can be depreciated
  • The landlord offers a generous rent-free period or contribution in exchange

Choose Cat A when

  • You want a mostly open-plan office with a few meeting rooms
  • Your timeline is tight and you need to move within three to four months
  • You are on a mid-length lease and want to limit capital spend

Consider fitted or Cat B-ready space when

  • You are a start-up or a team under 20 people
  • You need to move within weeks, not months
  • Flexibility matters more than branding, so a serviced or previously fitted office makes sense

Program: how long each level takes

Durations depend on approvals more than construction. A typical sequence for a 5,000 sqft office in Dubai is:

  1. Design and landlord review: three to six weeks for Cat B, longer from shell.
  2. Authority approvals: two to six weeks, running partly in parallel with procurement.
  3. Long-lead items: glass partitions, bespoke joinery, imported furniture and AV can take six to ten weeks to arrive, so order them as soon as drawings are approved.
  4. Construction: eight to fourteen weeks depending on level and specification.
  5. Testing, inspections and handover: one to three weeks for Civil Defence inspection, landlord sign-off and snagging.

Scope gaps that cause disputes

When the landlord delivers Cat A and the tenant's contractor delivers Cat B, there is always an interface. Agree in writing who is responsible for:

  • Defects in the landlord's Cat A work discovered during your fit-out
  • Balancing and commissioning the air-conditioning after your changes
  • Connection to the building management system and fire alarm panel
  • Damage to common areas during deliveries
  • Out-of-hours noisy work allowances and service lift bookings

Before your contractor starts, carry out a joint condition survey with photos. It protects you at handover and again at the end of the lease.

Practical tips for UAE tenants

  • Ask for the building's fit-out manual before agreeing terms. It lists permitted materials, working hours, security deposits and nominated subcontractors.
  • Budget for the landlord's fit-out deposit and any review fees. These vary by building, so ask for the current figures.
  • Keep the Cat A ceiling grid where you can. Open-plan zones under a retained ceiling are the cheapest square feet in a Cat B fit-out.
  • Plan the pantry and toilets near existing drainage risers. Long horizontal drainage runs in a raised floor are expensive and risky.
  • Think about the summer. External deliveries and work on roofs or terraces in July and August are slower due to the midday break rules for outdoor labor.

Key takeaways

  • Shell and core is the bare building, Cat A is a lettable open floor, and Cat B is your company's layout and identity.
  • Confirm the exact handover specification in the lease, not in the brochure.
  • Expect to modify part of any Cat A installation; budget for it.
  • Negotiate rent-free periods, contributions and reinstatement terms before signing.
  • Approvals from the landlord, the zone authority and Civil Defence drive the program.

Plan your office fit-out with us

FIXORA Decor delivers Cat A and Cat B fit-outs across Dubai, from small JLT suites to full floors in Business Bay. We review your lease and the landlord's manual, show you which Cat A elements can be reused and give you a clear, itemized budget. Request a quote or message us on WhatsApp at +971501962136 to arrange a site visit.

The information in this article is general guidance, not advice for your specific project. See our Terms.

Frequently asked questions

Cat A is the landlord's basic finished open floor with ceilings, lighting, air-conditioning distribution and fire services. Cat B is the tenant's own layout on top of it: partitions, meeting rooms, pantry, joinery, furniture, branding, AV and IT.
Usually the landlord, when the unit is leased at Cat A. If the unit is handed over as shell and core, the tenant normally pays for Cat A, often supported by a longer rent-free period or a fit-out contribution negotiated in the lease.
As an indicative 2026 range, a Cat B fit-out on a Cat A floor runs from about AED 150 to 450 per sqft excluding VAT, depending on specification and how much of the Cat A installation has to be modified. Premium projects can be higher.
Yes. You normally need landlord approval plus approval from Dubai Municipality or the relevant free zone authority, and Civil Defence approval for fire alarm and sprinkler changes. Check current requirements with the authority or your consultant.
Rent may be similar, but shell and core units usually come with longer rent-free periods because the tenant carries the cost and time of building Cat A. The total cost depends on the lease length and the incentives offered.

Sources

Was this article helpful?

Get new articles by email

Practical tips now and then. Confirm by email, unsubscribe any time.

Need help with your project?

Our team is ready to help — get a free quotation today.

Or call us+971 50 196 2136

Serving