Business Bay Trading Company Headquarters Fit-Out
Business Bay office fit-out for a trading company's regional HQ: 900 m² across two connected floors, with partitions, glazing, ceilings, full MEP upgrade, structured cabling, branded reception and pantry, delivered in twelve weeks.
Quick answer
Business Bay office fit-out for a trading company's regional HQ: 900 m² across two connected floors, with partitions, glazing, ceilings, full MEP upgrade, structured cabling, branded reception and pantry, delivered in twelve weeks. This Business Bay office fit-out delivered a trading company's new regional headquarters across two connected floors totalling 900 m² in twelve weeks.
Key facts
- This Business Bay office fit-out delivered a trading company's new regional headquarters across two connected floors totalling 900 m² in twelve weeks.
Last updated:
This Business Bay office fit-out delivered a trading company's new regional headquarters across two connected floors totalling 900 m² in twelve weeks. FIXORA Decor handled partitions and glazing, suspended ceilings, a full mechanical, electrical and plumbing upgrade, structured cabling to an open-plan trading floor, branded reception joinery, feature-wall signage and a staff pantry. The case study below sets out the scope, the coordination challenges of a two-floor job in a busy tower, and practical lessons for companies relocating their own headquarters.
Project at a glance
| Item | Detail |
|---|---|
| Location | Business Bay, Dubai |
| Client | Trading company (regional headquarters) |
| Area | 900 m² across two connected floors |
| Duration | 12 weeks |
| Key spaces | Executive offices, open-plan trading floor, meeting rooms, staff pantry, branded reception |
The brief
A trading company relocating its regional headquarters to Business Bay asked FIXORA Decor to fit out two connected floors, including executive offices, an open-plan trading floor, meeting rooms and a staff pantry. The brief called for the company's branding to be carried through reception, signage and feature walls.
Scope of work
- Building management permit and fit-out drawing approval through Dubai Development Authority requirements for the tower
- Partitions and glazing to executive offices and meeting rooms
- Suspended ceilings, revised lighting and a full mechanical, electrical and plumbing upgrade
- Raised and structured cabling to the open-plan trading floor
- Joinery, branded reception desk and feature wall signage
- Pantry fit-out with new plumbing points and finishes
The challenges
Coordinating works across two floors meant staggering trades so deliveries and lift bookings did not clash, and a DEWA disconnection was required to upgrade the distribution boards serving both floors, scheduled over a weekend to avoid affecting other tenants. The twelve-week program ran through part of the summer, so material deliveries and any external works were planned around the midday heat restriction.
The result
The trading company moved into its new headquarters in twelve weeks, with a consistent branded identity carried from reception through to the trading floor. The upgraded cabling and power distribution now comfortably support the open-plan trading desks and meeting room technology.
How approvals work for a Business Bay headquarters
Office towers in Business Bay usually require two layers of sign-off before work starts. The building management or landlord reviews the design against the tower's fit-out guide, and the drawings are processed under the requirements of the relevant authority, which for this tower was the Dubai Development Authority. Fire and life-safety changes are reviewed and later inspected by Dubai Civil Defence. Our step-by-step explainer on DDA fit-out approval covers the general process; always check the current requirements and fees with the authority and your landlord, as they differ between towers.
Owners should allow time in the overall program for design development, drawing submission and any comments before construction starts. Approval time is often the least predictable part of a fit-out, so companies with a fixed lease start or relocation date should start the design stage early.
Running a two-floor fit-out in an occupied tower
A fit-out across two floors is not simply twice a single-floor job. Two work areas share the same lifts, loading bay and corridors, and both must respect the tower's rules on noise and working hours. On projects like this we typically:
- Stagger trades between floors so that one floor is in partitioning while the other is in ceilings or finishes, keeping crews productive without crowding.
- Consolidate deliveries into booked lift slots per floor, so materials for one floor do not block access to the other.
- Plan shared services once. Distribution boards, risers and data routes that serve both floors are designed together, which is why a single DEWA disconnection could cover both floors here.
- Schedule disruptive work out of hours. Weekend shutdowns protect other tenants who are still trading during the week.
Working through the Dubai summer
Most fit-out work is indoors and air-conditioned once the base build systems are running, but deliveries, loading bay activity and any external work are affected by the summer midday outdoor work break. Planning deliveries for early morning or later in the day avoids idle time. Check the current dates and hours of the midday break each year, as the rule is announced annually.
Designing an open-plan trading floor
Trading and sales floors have heavier technical demands than a typical open-plan office. Each desk often runs several screens, phones and network connections, and downtime is costly. General design considerations include:
- Cable management. Raised floors or well-planned floor boxes keep power and data tidy and allow desks to be reconfigured later.
- Power distribution. Enough circuits for dense desk loads, with clear labeling and spare capacity for growth.
- Acoustics. Hard surfaces and lots of phone calls create noise; ceiling tiles, carpet and acoustic panels help. See our guide to acoustic design for open-plan offices.
- Cooling. Dense equipment adds heat, so HVAC diffusers and returns are often rebalanced to suit the new layout.
- Glare control. Floor-to-ceiling glazing in Business Bay brings strong sun; blinds and desk orientation reduce screen glare.
Carrying the brand through the space
A consistent brand identity, from reception to the trading floor, is usually achieved through a small set of repeated elements rather than logos on every wall: a reception desk in the brand's colors or materials, a feature wall with signage, wayfinding graphics, and finishes that echo the corporate palette in meeting rooms. Custom reception desks and feature walls are joinery items, so they are designed and approved early to allow time for shop drawings and fabrication. Our joinery and carpentry service covers this kind of bespoke work.
Fitting out a staff pantry
A pantry looks like a small item on a headquarters scope, but it involves new plumbing points, drainage, electrical circuits for appliances and finishes that cope with daily use. In an office tower, new water and drainage connections have to be routed to approved points, which can limit where the pantry sits on the floor plan. Owners planning a similar space should think about:
- Location close to existing wet risers to keep drainage runs short and falls achievable.
- Durable surfaces such as a non-porous worktop, a washable splashback and slip-resistant flooring.
- Dedicated circuits for kettles, coffee machines, fridges and microwaves, which together draw significant power.
- Ventilation and odor so the pantry does not affect nearby meeting rooms.
- Leak protection, since a pantry leak in a tower can reach the floor below.
Indicative cost factors
The ranges below are typical, indicative 2026 figures that depend on scope and specification. They are confirmed only after a site survey and exclude 5% VAT.
| Fit-out level | Indicative range (AED per sq ft) | Typical content |
|---|---|---|
| Light refresh of a fitted office | 150–350 | Paint, carpet, minor partitions |
| Standard Cat B fit-out on a Cat A base | 250–450 | Partitions, ceilings, MEP changes, finishes |
| High-end office | 450 and above | Feature joinery, glass, acoustic treatment |
On a headquarters project, cost is also driven by the amount of glazing, the extent of MEP changes, cabling density, branded joinery and furniture. Our office fit-out cost planner breaks these down further, and our guide to gypsum and glass partition costs explains how partition choices affect the budget.
Lessons for companies relocating their headquarters
- Start design before the lease clock runs. Approvals take time, and rent-free periods are often shorter than a full design-and-build cycle.
- Brief IT and AV early. Cabling routes, equipment rooms and meeting room technology need to be in the drawings, not added later.
- Coordinate the shutdown. Distribution board upgrades need a planned outage agreed with building management.
- Fix the brand elements early. Signage and reception joinery have longer lead times than standard finishes.
- Plan the move itself. Furniture delivery, IT installation and staff move-in need their own schedule; our office relocation checklist helps.
Planning checklist
- Confirm headcount, growth plans and space needs by department.
- Obtain the tower's fit-out guide and submission requirements.
- Prepare layout, MEP, fire and IT drawings for approval.
- Agree lift booking, delivery and working-hour rules with building management.
- Schedule any DEWA disconnection with building management.
- Plan summer deliveries around the midday break.
- Book the Civil Defence inspection and allow time for snagging before move-in.
Key takeaways
- A 900 m², two-floor regional headquarters in Business Bay was fitted out in twelve weeks.
- Staggered trades and coordinated lift bookings kept both floors moving without clashes.
- A weekend DEWA disconnection upgraded distribution boards for both floors without affecting other tenants.
- Upgraded cabling and power now support the trading desks and meeting room technology.
For a single contractor from design to handover, see our turnkey fit-out service. You may also find our Business Bay engineering consultancy office floor and clinic group admin office case studies useful.
Frequently asked questions
Who approves an office fit-out in Business Bay?
Building management reviews the design against the tower's fit-out guide, and drawings are processed under the relevant authority's requirements, which for this tower was the Dubai Development Authority. Dubai Civil Defence inspects fire and life-safety works.
How long does a 900 m² office fit-out take?
This two-floor headquarters took twelve weeks. Duration depends on approvals, MEP scope, joinery lead times and how quickly design decisions are made.
Why was the DEWA disconnection done over a weekend?
Upgrading distribution boards requires the power to be isolated. Doing it at the weekend avoided affecting other tenants in the tower during their working week.
Does the summer heat affect indoor office fit-outs in Dubai?
Indoor work continues, but deliveries and any external work are planned around the summer midday outdoor work break, so programs should allow for it.
What is structured cabling and why does a trading floor need it?
Structured cabling is an organized network of data cables and patch points serving every desk. Trading floors use many screens and connections, so a planned system keeps them reliable and easy to change.
Plan your headquarters fit-out with FIXORA Decor
If your company is moving into a new office in Business Bay or elsewhere in Dubai, FIXORA Decor can help from layout and approvals to branding and handover. WhatsApp +971501962136, call +971 50 196 2136, or request a quote to book a site survey.
Gallery
Frequently asked questions
Building management reviews the design against the tower's fit-out guide, and drawings are processed under the relevant authority's requirements, which for this tower was the Dubai Development Authority. Dubai Civil Defence inspects fire and life-safety works.
This two-floor headquarters took twelve weeks. Duration depends on approvals, MEP scope, joinery lead times and how quickly design decisions are made.
Upgrading distribution boards requires the power to be isolated. Doing it at the weekend avoided affecting other tenants in the tower during their working week.
Indoor work continues, but deliveries and any external work are planned around the summer midday outdoor work break, so programmes should allow for it.
Structured cabling is an organised network of data cables and patch points serving every desk. Trading floors use many screens and connections, so a planned system keeps them reliable and easy to change.