Projects & case studies
Selected work by FIXORA Decor in Dubai, with photos and details.

Dental clinic fit-out in Dubai Healthcare City
Dental clinic fit-out in Dubai Healthcare City: a 210 m² multi-chair clinic delivered in ten weeks, with a lead-lined X-ray room, infection-control finishes, medical gas and compressed air first-fix and a sterilization room for autoclaves.
- Area:
- 210 m²
- Duration:
- 10 weeks

Dubai Healthcare City Multi-Specialty Outpatient Clinic Fit-Out
A 420 m² multi-specialty outpatient clinic in Dubai Healthcare City: 8 consultation rooms, a minor procedure room, sterilization, a small lab collection area and a family-friendly waiting area, delivered in 16 weeks with healthcare regulator and Civil Defence approvals.
- Area:
- 420 m²
- Duration:
- 16 weeks

Dental Clinic Reception & Treatment Rooms — Healthcare City
Dental clinic fit-out in Dubai Healthcare City: a 1,400 sq ft reception and treatment room project delivered in five weeks, with antibacterial wall cladding, hidden MEP, warm reception joinery and acoustic gypsum partitions.
- Area:
- 1,400 sq ft
- Duration:
- 5 weeks

General practice clinic fit-out in Al Nahda, Sharjah
GP clinic fit-out in Al Nahda, Sharjah: a 240 m² general practice clinic with consultation rooms, a minor procedures room, nurse station and pharmacy counter, infection-control finishes and a compliant medical waste room, delivered in nine weeks.
- Area:
- 240 m²
- Duration:
- 9 weeks

Physiotherapy center fit-out in JVC
Physiotherapy center fit-out in JVC, Dubai: a 300 m² rehabilitation center delivered in nine weeks with a reinforced gym floor, acoustically separated treatment rooms, infection-control finishes and a plumbing allowance for a future hydrotherapy pool.
- Area:
- 300 m²
- Duration:
- 9 weeks

Community pharmacy fit-out in Al Karama
Pharmacy fit-out in Al Karama, Dubai: an 85 m² ground-floor community pharmacy delivered in five weeks with a secure controlled-medicine room, temperature-monitored storage, a private consultation point and infection-control dispensary finishes.
- Area:
- 85 m²
- Duration:
- 5 weeks

Veterinary clinic fit-out in Al Barsha
Veterinary clinic fit-out in Al Barsha, Dubai: a 260 m² small-animal clinic with a surgical theater, radiation-shielded X-ray room, boarding kennels and consultation rooms, delivered in 10 weeks with full authority sign-off.
- Area:
- 260 m²
- Duration:
- 10 weeks

Dubai Pharmacy Chain Store Refresh Program Across Six Branches
A rolling refresh of six community pharmacy branches across Dubai, from Al Barsha to Mirdif, with new shelving, dispensing counters, counseling corners, lighting and signage, delivered branch by branch overnight while each pharmacy kept trading.
- Area:
- 6 branches, 70–160 m² each
- Duration:
- 12 weeks programme, 3–5 nights per branch