Projects & case studies
Selected work by FIXORA Decor in Dubai, with photos and details.

Full-service restaurant fit-out in Business Bay
Restaurant fit-out in Business Bay: a 320 m² full-service restaurant in a tower, delivered in 14 weeks with an open show kitchen, dining room and terrace, and Dubai Municipality and Civil Defence approvals managed from design stage.
- Area:
- 320 m²
- Duration:
- 14 weeks

Beachfront restaurant refurbishment on Palm Jumeirah
An illustrative restaurant refurbishment on Palm Jumeirah: a 420 m² indoor dining room and 260 m² sea-facing terrace renewed in ten weeks during the summer low season, with a new bar, shading, corrosion-resistant finishes and a refreshed kitchen line.
- Area:
- 680 m² (420 m² indoor, 260 m² terrace)
- Duration:
- 10 weeks

Hotel guest room refurbishment in Downtown Dubai: 64 rooms floor by floor
An illustrative hotel room refurbishment in Downtown Dubai: 64 guest rooms and corridors renewed floor by floor while the hotel stayed open, with acoustic controls, a mock-up room, new bathrooms and a 13-day turnaround per floor.
- Area:
- 64 rooms and 4 corridors (approx. 2,600 m²)
- Duration:
- 6 months including mock-up room

Restaurant Fit-Out — Saffron Kitchen, Jumeirah
Restaurant fit-out in Jumeirah for Saffron Kitchen: a 2,300 sq ft full F&B fit-out delivered in eight weeks, with commercial kitchen extraction, Dubai Municipality food control approvals, terrazzo floors, a bespoke bar and banquette seating, and brass-accent joinery.
- Area:
- 2,300 sq ft
- Duration:
- 8 weeks

Independent café fit-out in JLT
Café fit-out in JLT: a 110 m² ground-floor unit turned into an independent café in eight weeks, with a compact kitchen to Dubai Municipality food premises requirements, extraction to the building riser, a grease trap and Civil Defence approval.
- Area:
- 110 m²
- Duration:
- 8 weeks

Cloud kitchen facility fit-out in Al Quoz
Cloud kitchen fit-out in Al Quoz: a 480 m² multi-brand delivery facility completed in ten weeks, with segregated cooking stations, shared extraction and grease trap sized for peak load, food-grade finishes and a separate rider holding area.
- Area:
- 480 m²
- Duration:
- 10 weeks

Hotel apartment building refurbishment in Barsha Heights
Hotel apartment refurbishment in Barsha Heights, Dubai: 180 guest units and corridors refreshed over 7 months, floor by floor, while the building stayed open, with new finishes, water-efficient fittings, fire-rated corridor doors and no guest complaints logged.
- Area:
- 180 guest units
- Duration:
- 7 months, phased

Neighborhood bakery fit-out in Mirdif
Bakery fit-out in Mirdif: a 130 m² neighborhood bakery and patisserie with a production area, oven extraction designed for heat and steam, display chillers and Dubai Municipality food premises sign-off, completed in six weeks.
- Area:
- 130 m²
- Duration:
- 6 weeks

Hotel apartment annual maintenance contract
Hotel apartment AMC in Dubai: a 12-month renewable maintenance contract covering 150 guest units and common areas, with preventive AC servicing scheduled around the booking calendar, guest-facing response tiers and no bookings relocated for maintenance.
- Area:
- 150 guest units
- Duration:
- 12-month contract, renewable

Specialty coffee kiosk fit-out in an Al Reem Island mall, Abu Dhabi
An illustrative mall kiosk fit-out for a specialty coffee concept on Al Reem Island, Abu Dhabi: a 14 m² island unit with a compact bar, drainage and power run under a live mall floor, built entirely at night and handed over in five weeks.
- Area:
- 14 m²
- Duration:
- 5 weeks on site (night works)