In this article
Quick answer
A step-by-step method for comparing renovation and fit-out quotations in Dubai like for like, covering scope, exclusions, provisional sums, payment schedules, VAT, timelines and warranties. To compare three renovation quotations fairly, first make them describe the same scope, then line up the exclusions, provisional sums and allowances, then compare payment schedules, programme and warranties, and only then compare the totals.
Key facts
- A tile allowance of AED 40 per m² will not buy a mid-range porcelain.
- Advance payment: 20–40% on signing.
- Final payment: 5–10% on handover and snagging completion.
- On commercial projects, retention of 5–10% held until the end of the defects period is common.
- Step 6: Compare programme, team and warranty
- Look for a written defects liability period, typically 6–12 months on workmanship, and manufacturer warranties passed on for materials and equipment.
Last updated:
To compare three renovation quotations fairly, first make them describe the same scope, then line up the exclusions, provisional sums and allowances, then compare payment schedules, program and warranties, and only then compare the totals. In Dubai, quotations for the same project often differ by 30–60%, and the cheapest headline price is frequently the one with the most exclusions or the lowest allowances. A simple side-by-side table, built from the steps below, usually reveals which offer is genuinely best value.
Whether you are renovating a bathroom in Al Barsha, a villa in Arabian Ranches or an office in Business Bay, the method is the same.
Step 1: Give every contractor the same brief
Most mismatches start with the brief. If one contractor sees a few photos and another visits the site and measures, their prices will not be comparable. Before requesting quotations, prepare a short written scope that each contractor receives:
- Floor plan or sketch with dimensions.
- A room-by-room list of what you want done.
- Your preferred finishes, or at least a quality level: basic, mid-range or premium.
- Appliances, sanitaryware or materials you will supply yourself.
- Timing constraints, such as a move-in date or lease start.
- Building or community rules you are aware of.
Ask every contractor to visit the site. A quotation produced without a site visit is an estimate, not a price.
Step 2: Line up the scope item by item
Break each quotation into the same headings: preliminaries and approvals, demolition, MEP, ceilings, partitions, flooring, wall finishes, joinery, kitchen, bathrooms, painting, cleaning. Write each contractor's price for each heading in a table. Where a contractor has not priced a heading, mark it clearly. Gaps are often where the price difference comes from.
Example of a comparison table for a mid-size apartment renovation:
| Item | Contractor A | Contractor B | Contractor C |
|---|---|---|---|
| Approvals and preliminaries | Included, AED 4,500 | Excluded | Included, AED 3,000 |
| Flooring, 80 m² SPC with skirting | AED 9,800 | AED 7,200 (no skirting) | AED 10,500 |
| Kitchen cabinetry and worktop | AED 38,000 | Provisional sum AED 25,000 | AED 41,000 |
| Bathroom, full with waterproofing | AED 26,000 | AED 19,000 (no flood test) | AED 27,500 |
| Painting, two coats | AED 3,200 | AED 2,400 (one coat) | AED 3,600 |
| Total excl. VAT | AED 81,500 | AED 53,600 | AED 85,600 |
| Adjusted like-for-like estimate | AED 81,500 | Typically AED 78,000–92,000 | AED 85,600 |
In this illustration, Contractor B looked 35% cheaper but becomes comparable or more expensive once missing items are added back and the provisional sum is replaced with a realistic figure.
Step 3: Read the exclusions carefully
Exclusions are usually at the end of the quotation. Common ones in Dubai include:
- Authority, developer and building management fees and deposits.
- Civil Defence modifications to fire alarm and sprinklers.
- DEWA load changes or meter relocations.
- AC modifications and duct cleaning.
- Appliances, light fittings, sanitaryware or loose furniture.
- Making good after hidden defects are found.
- Out-of-hours working if the building restricts noise.
- Final cleaning and debris removal.
For each exclusion, decide whether it applies to your project and estimate its cost. Then add it to that contractor's total.
Step 4: Check provisional sums and allowances
A provisional sum is an amount included for work that cannot yet be fully defined. A PC (prime cost) sum or allowance is an amount for items you will choose later, such as tiles at AED 80 per m² or a mixer at AED 600. Both are legitimate, but they can make a quotation look cheap.
- Compare allowances against the quality you actually want. A tile allowance of AED 40 per m² will not buy a mid-range porcelain.
- Ask how adjustments are calculated if you choose something more expensive, and whether the contractor adds a margin.
- Try to convert provisional sums into fixed prices before signing, at least for the larger items.
Step 5: Compare payment schedules
How and when you pay matters as much as how much. Typical schedules in Dubai residential projects look like this:
- Advance payment: 20–40% on signing.
- Stage payments linked to milestones, such as completion of MEP first fix, ceilings, tiling and joinery installation.
- Final payment: 5–10% on handover and snagging completion.
Be cautious with schedules that require most of the money upfront, or stage payments linked to dates rather than completed work. On commercial projects, retention of 5–10% held until the end of the defects period is common. Remember that VAT applies to every payment, including the deposit. Our guide on how VAT applies to fit-out invoices explains what each invoice should show.
Step 6: Compare program, team and warranty
Program
Ask each contractor for a simple program showing approvals, procurement lead times, site work and handover. An unrealistically short program often leads to rushed work or delays later.
Team and subcontracting
Ask which trades are done in-house and which are subcontracted, who will be the site supervisor and how often they will be on site. In-house joinery and MEP usually mean fewer coordination problems.
Warranty and defects period
Look for a written defects liability period, typically 6–12 months on workmanship, and manufacturer warranties passed on for materials and equipment. Check whether waterproofing carries a longer warranty and what the process is for reporting defects.
Paperwork
Confirm the contractor's trade license covers the activities quoted, that they hold suitable insurance, and that the quotation shows their TRN if they charge VAT.
Step 7: Ask the right questions before deciding
Once your table is complete, a short meeting or call with each contractor clarifies the remaining doubts. Useful questions include:
- Which items in your price are fixed, and which could change once work starts?
- How will you handle hidden defects found after demolition, and at what rates?
- Who will apply for the building, developer and authority approvals, and who pays the fees?
- What are the lead times for joinery, glass and imported materials?
- How will the site be protected, and how will debris leave the building?
- What happens if the program slips because of the contractor, and what if it slips because of my late decisions?
- Can I see a recently completed project of a similar scope?
Write down the answers and add the important ones to the contract. A contractor who answers clearly and in writing at this stage is usually easier to work with once the project is underway. Finally, score each offer not only on adjusted price but also on scope clarity, program, payment terms and warranty. The best value is the offer that gives you the result you want with the fewest open questions.
Common mistakes
- Choosing on total price alone: the gap usually reflects scope differences, not efficiency.
- Accepting verbal clarifications: anything agreed should be added to the quotation or contract in writing.
- Ignoring variations: ask for the contractor's rates for common variations, such as extra sockets or additional tiling per m², before signing.
- No contingency: even a well-compared quotation needs 10–15% contingency. The villa renovation budget guide explains how much to hold back.
- Skipping consumer protections: Federal Law No. 15 of 2020 on consumer protection gives consumers rights, but clear written terms remain your best protection.
FIXORA Decor prepares quotations with a full breakdown by room and trade, a list of exclusions in plain language and fixed prices wherever the scope allows, so you can compare them easily with any other offer. If you already have quotations, FIXORA Decor can price the same scope so you can line them up side by side.
Next step
Share your scope and drawings and request a free quotation broken down by trade, with exclusions and payment terms clearly stated. For complete projects managed from design to handover, see our turnkey fit-out service.
The information in this article is general guidance, not advice for your specific project. See our Terms.